BIM transition in developing countries: A framework based on evidence from the Turkish AEC industry

Building Information Modeling (BIM) adoption in the Architecture, Engineering, and Construction (AEC) industry remains a complex process, particularly in developing countries. This study proposes a BIM transition framework, structured around six components: motivations, inputs, enablers, obstacles, benefits, and impacts, to ease BIM implementation. Through expert interviews in the AEC sector, 46 critical factors were identified and evaluated. Findings show that client requirements are a primary motivation, while investment in software and hardware is a key input, especially emphasized by Construction firms. Top management support is the most influential enabler, whereas its absence is a major obstacle. Results also implied that Construction companies give more importance to inputs than Engineering and Architectural companies. Overall, AEC companies experience differences in implementing BIM, and the BIM transition process proposed in this paper will help companies understand the BIM success factors, as well as their relative importance for BIM adoption.

Authors

Institutions

Publication Details

Journal
International Journal of Architectural Computing
Published
2026-07-01
DOI
https://doi.org/10.1177/14780771261467182
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

BIM transition in developing countries: A framework based on evidence from the Turkish AEC industry

Beliz Özorhon, Gulbin Ozcan-Deniz, Cankat Güler
International Journal of Architectural Computing
BIM and Construction Integration
article

BIM transition in developing countries: A framework based on evidence from the Turkish AEC industry

Beliz Özorhon, Gulbin Ozcan-Deniz, Cankat Güler
article en

Abstract

Building Information Modeling (BIM) adoption in the Architecture, Engineering, and Construction (AEC) industry remains a complex process, particularly in developing countries. This study proposes a BIM transition framework, structured around six components: motivations, inputs, enablers, obstacles, benefits, and impacts, to ease BIM implementation. Through expert interviews in the AEC sector, 46 critical factors were identified and evaluated. Findings show that client requirements are a primary motivation, while investment in software and hardware is a key input, especially emphasized by Construction firms. Top management support is the most influential enabler, whereas its absence is a major obstacle. Results also implied that Construction companies give more importance to inputs than Engineering and Architectural companies. Overall, AEC companies experience differences in implementing BIM, and the BIM transition process proposed in this paper will help companies understand the BIM success factors, as well as their relative importance for BIM adoption.

International Journal of Architectural Computing
Thomas Jefferson University (US), Boğaziçi University (TR)
Openalex Percentile: Top 9%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.