Social life cycle assessment of green hydrogen integration with geothermal power plants: production and use as a spinning reserve

This study performs an ex-ante Social Life Cycle Performance Assessment to a hydrogen-based supplementary section of a geothermal power plant, operating as a spinning reserve, i.e. storing surplus energy and dispatching it when required. The system operates in two modes: accumulation phase, for hydrogen production via geothermal-powered electrolysis and storage, and electricity generation phase through oxy-combustion of stored gases. The assessment, aligned with ISO 14075:2024, identifies social hotspots within this hybrid configuration. Results indicate that the storage subsystem and operational stage account for over 70% of social risks. Upstream processes associated with the accumulation subsystem, particularly the extraction of critical materials like nickel and platinum for the electrolyser stack, are primary risk drivers. The findings demonstrate the usefulness of ex-ante Social Life Cycle Performance Assessment in early-stage technology design, supporting decisions as prioritising low-impact material supply chains, improving supplier selection criteria, and guiding policy frameworks for socially responsible hydrogen deployment.

Authors

Institutions

Publication Details

Journal
International Journal of Hydrogen Energy
Published
2026-07-01
DOI
https://doi.org/10.1016/j.ijhydene.2026.156208
Primary Topic
Hybrid Renewable Energy Systems
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Social life cycle assessment of green hydrogen integration with geothermal power plants: production and use as a spinning reserve

Davis Jose, Daniele Fiaschi, Marzia Traverso, Alessia Manfredi
International Journal of Hydrogen Energy
Hybrid Renewable Energy Systems
article

Social life cycle assessment of green hydrogen integration with geothermal power plants: production and use as a spinning reserve

Davis Jose, Daniele Fiaschi, Marzia Traverso, Alessia Manfredi
article en

Abstract

This study performs an ex-ante Social Life Cycle Performance Assessment to a hydrogen-based supplementary section of a geothermal power plant, operating as a spinning reserve, i.e. storing surplus energy and dispatching it when required. The system operates in two modes: accumulation phase, for hydrogen production via geothermal-powered electrolysis and storage, and electricity generation phase through oxy-combustion of stored gases. The assessment, aligned with ISO 14075:2024, identifies social hotspots within this hybrid configuration. Results indicate that the storage subsystem and operational stage account for over 70% of social risks. Upstream processes associated with the accumulation subsystem, particularly the extraction of critical materials like nickel and platinum for the electrolyser stack, are primary risk drivers. The findings demonstrate the usefulness of ex-ante Social Life Cycle Performance Assessment in early-stage technology design, supporting decisions as prioritising low-impact material supply chains, improving supplier selection criteria, and guiding policy frameworks for socially responsible hydrogen deployment.

International Journal of Hydrogen EnergyVol. 254
University of Florence (IT), RWTH Aachen University (DE)
Responsible consumption and production
Openalex Percentile: Top 16%
Hybrid Renewable Energy Systems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.