Quantifying Conflict Levels in Construction Projects Based on Stakeholder Perception Gaps through Fuzzy Analytic Hierarchy Process

Conflicts among stakeholders frequently occur in public construction projects and often result in schedule delays, cost increases, and reduced social acceptance. Although previous studies have identified important conflict factors, limited research has provided a project-level quantitative indicator that can diagnose conflict intensity from the perspective of stakeholder disagreement. This study proposes a perception gap-based conflict level (PG-CL) model that operationalizes stakeholder perception gaps using the fuzzy analytic hierarchy process (fuzzy-AHP). Nineteen conflict factors were identified through a literature review and expert interviews and then structured into four categories. Their relative weights were estimated through pairwise comparisons from 38 experts using fuzzy-AHP, while perception-gap data were obtained from two representative public infrastructure conflict cases. The proposed PG-CL was further examined through convergent validation using 22 public construction cases. This study contributes by reframing public construction conflict through stakeholder perception gaps and by translating those differences into a structured project-level indicator. In this way, PG-CL provides a measurable basis for conflict diagnosis, prioritization of key conflict factors, and future extension toward real-time conflict monitoring.

Authors

Institutions

Publication Details

Journal
KSCE Journal of Civil Engineering
Published
2026-07-01
DOI
https://doi.org/10.1016/j.kscej.2026.100671
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Quantifying Conflict Levels in Construction Projects Based on Stakeholder Perception Gaps through Fuzzy Analytic Hierarchy Process

Jang Hee Min, Sungmin Yun, Changjun Lee, Seung Heon Han
KSCE Journal of Civil Engineering
Construction Project Management and Performance
article

Quantifying Conflict Levels in Construction Projects Based on Stakeholder Perception Gaps through Fuzzy Analytic Hierarchy Process

Jang Hee Min, Sungmin Yun, Changjun Lee, Seung Heon Han
article en

Abstract

Conflicts among stakeholders frequently occur in public construction projects and often result in schedule delays, cost increases, and reduced social acceptance. Although previous studies have identified important conflict factors, limited research has provided a project-level quantitative indicator that can diagnose conflict intensity from the perspective of stakeholder disagreement. This study proposes a perception gap-based conflict level (PG-CL) model that operationalizes stakeholder perception gaps using the fuzzy analytic hierarchy process (fuzzy-AHP). Nineteen conflict factors were identified through a literature review and expert interviews and then structured into four categories. Their relative weights were estimated through pairwise comparisons from 38 experts using fuzzy-AHP, while perception-gap data were obtained from two representative public infrastructure conflict cases. The proposed PG-CL was further examined through convergent validation using 22 public construction cases. This study contributes by reframing public construction conflict through stakeholder perception gaps and by translating those differences into a structured project-level indicator. In this way, PG-CL provides a measurable basis for conflict diagnosis, prioritization of key conflict factors, and future extension toward real-time conflict monitoring.

KSCE Journal of Civil Engineering
Yonsei University (KR), Manchester Airport (GB), Korea Institute of Civil Engineering and Building Technology (KR), Yeungnam University (KR)
National Research Foundation of Korea, Ministry of Science and ICT, South Korea
Sustainable cities and communities
Openalex Percentile: Top 4%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.