Assessment of Factors Affecting Cost Management in Low Cost Housing Project Delivery in Ebonyi State

This study assessed the factors affecting cost management and the challenges hindering effective cost control in low-cost housing project delivery in Ebonyi State, Nigeria. A descriptive survey research design was adopted, and data were collected from 278 construction professionals, including quantity surveyors, architects, builders, engineers, project managers, and contractors. Data were analyzed using mean score, standard deviation and ranking techniques. The findings revealed that fluctuations in construction materials prices, poor supervision and site management,ineffective communication among stakeholders, inflation, inaccurate cost estimation, and inadequate funding are the major factors affecting cost management in low-cost housing projects. The study further found that delayed release of project funds, inflation, inadequate cost monitoring systems, and frequent design changes are the major challenges hindering effective cost management. The study concludes that effective planning, proper financial management, continuous cost monitoring, and stakeholder collaboration are essential for improving cost performance and enhancing affordable housing delivery in Ebonyi State.

Authors

Publication Details

Journal
Iconic Research and Engineering Journals
Published
2026-06-30
DOI
https://doi.org/10.64388/irev9i12-1719308
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Assessment of Factors Affecting Cost Management in Low Cost Housing Project Delivery in Ebonyi State

Chukwuemeka Ngwu, Nwobu Ifeanyichukwu Chukwunonso, Ibiyemi Mutiu Tolani, Eze Gideon Chigozie
Iconic Research and Engineering Journals
Construction Project Management and Performance
article

Assessment of Factors Affecting Cost Management in Low Cost Housing Project Delivery in Ebonyi State

Chukwuemeka Ngwu, Nwobu Ifeanyichukwu Chukwunonso, Ibiyemi Mutiu Tolani, Eze Gideon Chigozie
article en

Abstract

This study assessed the factors affecting cost management and the challenges hindering effective cost control in low-cost housing project delivery in Ebonyi State, Nigeria. A descriptive survey research design was adopted, and data were collected from 278 construction professionals, including quantity surveyors, architects, builders, engineers, project managers, and contractors. Data were analyzed using mean score, standard deviation and ranking techniques. The findings revealed that fluctuations in construction materials prices, poor supervision and site management,ineffective communication among stakeholders, inflation, inaccurate cost estimation, and inadequate funding are the major factors affecting cost management in low-cost housing projects. The study further found that delayed release of project funds, inflation, inadequate cost monitoring systems, and frequent design changes are the major challenges hindering effective cost management. The study concludes that effective planning, proper financial management, continuous cost monitoring, and stakeholder collaboration are essential for improving cost performance and enhancing affordable housing delivery in Ebonyi State.

Iconic Research and Engineering JournalsVol. 9(12)
No poverty
Openalex Percentile: Top 5%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.