Maximizing the Total Weight of Just‐In‐Time Jobs in A Two‐Stage Flexible Flow Shop With Dedicated Machines

ABSTRACT We study a two‐stage flexible flow shop scheduling problem aimed at maximizing the total weight of just‐in‐time jobs, defined as those that complete exactly on their due dates. Two machine configurations are examined: (i) a single common bottleneck machine at stage 1 and parallel dedicated machines at stage 2; (ii) parallel dedicated machines at stage 1 and a single common bottleneck machine at stage 2, where denotes the number of parallel dedicated machines. For the first configuration, we propose a pseudo‐polynomial‐time dynamic programming algorithm and a fully polynomial‐time approximation scheme when is fixed. For the second configuration, we establish that the problem is strongly ‐hard for arbitrary , even when all jobs have unit weight, and show that it remains ordinarily ‐hard for under the same condition. We then design a pseudo‐polynomial‐time algorithm for fixed .

Authors

Institutions

Publication Details

Journal
Naval Research Logistics (NRL)
Published
2026-06-28
DOI
https://doi.org/10.1002/nav.70084
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Maximizing the Total Weight of Just‐In‐Time Jobs in A Two‐Stage Flexible Flow Shop With Dedicated Machines

Junling Yuan, S Li, Li X, Ren‐Xia Chen
Naval Research Logistics (NRL)
Scheduling and Optimization Algorithms
article

Maximizing the Total Weight of Just‐In‐Time Jobs in A Two‐Stage Flexible Flow Shop With Dedicated Machines

Junling Yuan, S Li, Li X, Ren‐Xia Chen
article en

Abstract

ABSTRACT We study a two‐stage flexible flow shop scheduling problem aimed at maximizing the total weight of just‐in‐time jobs, defined as those that complete exactly on their due dates. Two machine configurations are examined: (i) a single common bottleneck machine at stage 1 and parallel dedicated machines at stage 2; (ii) parallel dedicated machines at stage 1 and a single common bottleneck machine at stage 2, where denotes the number of parallel dedicated machines. For the first configuration, we propose a pseudo‐polynomial‐time dynamic programming algorithm and a fully polynomial‐time approximation scheme when is fixed. For the second configuration, we establish that the problem is strongly ‐hard for arbitrary , even when all jobs have unit weight, and show that it remains ordinarily ‐hard for under the same condition. We then design a pseudo‐polynomial‐time algorithm for fixed .

Naval Research Logistics (NRL)
Zhongyuan University of Technology (CN), Zhengzhou University of Light Industry (CN)
Decent work and economic growth
Openalex Percentile: Top 7%
Scheduling and Optimization Algorithms
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.