Maximizing the Total Weight of Just‐In‐Time Jobs in A Two‐Stage Flexible Flow Shop With Dedicated Machines
ABSTRACT We study a two‐stage flexible flow shop scheduling problem aimed at maximizing the total weight of just‐in‐time jobs, defined as those that complete exactly on their due dates. Two machine configurations are examined: (i) a single common bottleneck machine at stage 1 and parallel dedicated machines at stage 2; (ii) parallel dedicated machines at stage 1 and a single common bottleneck machine at stage 2, where denotes the number of parallel dedicated machines. For the first configuration, we propose a pseudo‐polynomial‐time dynamic programming algorithm and a fully polynomial‐time approximation scheme when is fixed. For the second configuration, we establish that the problem is strongly ‐hard for arbitrary , even when all jobs have unit weight, and show that it remains ordinarily ‐hard for under the same condition. We then design a pseudo‐polynomial‐time algorithm for fixed .
Authors
- Junling Yuan (ORCID: https://orcid.org/0000-0001-6734-9256)
- S Li
- Li X
- Ren‐Xia Chen
Institutions
- Zhongyuan University of Technology (CN)
- Zhengzhou University of Light Industry (CN)
Publication Details
- Journal
- Naval Research Logistics (NRL)
- Published
- 2026-06-28
- DOI
- https://doi.org/10.1002/nav.70084
- Primary Topic
- Scheduling and Optimization Algorithms
- Type
- article
- Field-Weighted Citation Impact
- 0.00