A novel modified mountain gazelle optimizer for enhancing resource scheduling problem in multi-project environment

Efficient resource allocation and leveling are critical to successful construction project scheduling, yet conventional methods often fail to balance project duration with stable resource utilization. This study introduces a modified mountain gazelle optimizer (mMGO), which extends the original single-objective MGO into a multi-objective optimization approach to address the complex trade-offs inherent in construction scheduling. In addition, the algorithm integrates opposition-based learning and dynamically controlled chaotic mapping to enhance global search capability and avoid premature convergence. The mMGO is embedded within a two-phase scheduling framework, in which the first phase generates resource-feasible baseline schedules, while the second phase redistributes activities to minimize fluctuations in multi-resource demand. To validate its performance, mMGO was verified through two case studies. Case study 1 consisted of five projects, each containing six activities, whereas case study 2 included three projects, each involving 60 activities. The results show that mMGO consistently achieved the highest hypervolume values, indicating closer convergence to the true Pareto front and greater diversity of non-dominated solutions. Moreover, mMGO produced schedules that simultaneously reduced project makespan, resource intensity, and resource utilization instability metrics. These findings indicate that mMGO has potential as a computational decision-support approach for multi-objective resource scheduling in benchmark multi-project environments.

Authors

Institutions

Publication Details

Journal
International Journal of Management Science and Engineering Management
Published
2026-06-28
DOI
https://doi.org/10.1080/17509653.2026.2694402
Primary Topic
Resource-Constrained Project Scheduling
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A novel modified mountain gazelle optimizer for enhancing resource scheduling problem in multi-project environment

Nghiep Trinh Nguyen Dang, Vu Hong Son Pham, Thuy Dung Dau, Le Anh Tran
International Journal of Management Science and Engineering Management
Resource-Constrained Project Scheduling
article

A novel modified mountain gazelle optimizer for enhancing resource scheduling problem in multi-project environment

Nghiep Trinh Nguyen Dang, Vu Hong Son Pham, Thuy Dung Dau, Le Anh Tran
article en

Abstract

Efficient resource allocation and leveling are critical to successful construction project scheduling, yet conventional methods often fail to balance project duration with stable resource utilization. This study introduces a modified mountain gazelle optimizer (mMGO), which extends the original single-objective MGO into a multi-objective optimization approach to address the complex trade-offs inherent in construction scheduling. In addition, the algorithm integrates opposition-based learning and dynamically controlled chaotic mapping to enhance global search capability and avoid premature convergence. The mMGO is embedded within a two-phase scheduling framework, in which the first phase generates resource-feasible baseline schedules, while the second phase redistributes activities to minimize fluctuations in multi-resource demand. To validate its performance, mMGO was verified through two case studies. Case study 1 consisted of five projects, each containing six activities, whereas case study 2 included three projects, each involving 60 activities. The results show that mMGO consistently achieved the highest hypervolume values, indicating closer convergence to the true Pareto front and greater diversity of non-dominated solutions. Moreover, mMGO produced schedules that simultaneously reduced project makespan, resource intensity, and resource utilization instability metrics. These findings indicate that mMGO has potential as a computational decision-support approach for multi-objective resource scheduling in benchmark multi-project environments.

International Journal of Management Science and Engineering Management
Vietnam National University Ho Chi Minh City (VN), Ho Chi Minh City University of Technology (VN)
Decent work and economic growth
Openalex Percentile: Top 4%
Resource-Constrained Project Scheduling
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.