Local control laws for fast corrective security-constrained optimal power flow

This paper proposes an approach for computing an optimal power flow jointly with local control laws for quickly-controllable grid assets that enable fast corrective actions after contingencies. While existing corrective security-constrained optimal power flow approaches rely on communication in the post-contingency phase, introducing delays, the proposed control scheme can react almost immediately after contingencies and thus allows for higher line loadings in normal operation. A novel min-max optimization approach based on the DC power flow model minimizes operating costs in the default case while ensuring feasibility even under the worst-case contingency, taking into account the locally controlled corrective actions. The resulting problem is solved via a column-and-constraint generation algorithm. Case studies on the modified IEEE 39-bus system and 118-bus system with additional high-voltage DC lines as quickly-controllable grid assets demonstrate the computational feasibility and economic advantages of the proposed approach. Compared to preventive and traditional corrective dispatch, this approach reduces costs for the 39-bus system by 14 % and 4 %, respectively.

Authors

Institutions

Publication Details

Journal
Electric Power Systems Research
Published
2026-06-27
DOI
https://doi.org/10.1016/j.epsr.2026.113522
Primary Topic
Power System Optimization and Stability
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Local control laws for fast corrective security-constrained optimal power flow

Florian Steinke, Helena Sax
Electric Power Systems Research
Power System Optimization and Stability
article

Local control laws for fast corrective security-constrained optimal power flow

Florian Steinke, Helena Sax
article en

Abstract

This paper proposes an approach for computing an optimal power flow jointly with local control laws for quickly-controllable grid assets that enable fast corrective actions after contingencies. While existing corrective security-constrained optimal power flow approaches rely on communication in the post-contingency phase, introducing delays, the proposed control scheme can react almost immediately after contingencies and thus allows for higher line loadings in normal operation. A novel min-max optimization approach based on the DC power flow model minimizes operating costs in the default case while ensuring feasibility even under the worst-case contingency, taking into account the locally controlled corrective actions. The resulting problem is solved via a column-and-constraint generation algorithm. Case studies on the modified IEEE 39-bus system and 118-bus system with additional high-voltage DC lines as quickly-controllable grid assets demonstrate the computational feasibility and economic advantages of the proposed approach. Compared to preventive and traditional corrective dispatch, this approach reduces costs for the 39-bus system by 14 % and 4 %, respectively.

Electric Power Systems ResearchVol. 262
Technische Universität Darmstadt (DE)
Technische Universität Darmstadt
Openalex Percentile: Top 10%
Power System Optimization and Stability
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.