Multi-objective intelligent model for optimizing labor allocation in construction projects

Purpose Typically, the number of workers per team is determined based on experience. This study aims to propose an integrated intelligent model aimed at reducing lost productivity and optimizing team sizes in construction projects to align with stakeholder interests and project objectives. The model focuses on maximizing profit and minimizing loss under the current project conditions and available resources. Subsequently, the model provides reliable estimates of the necessary information and the impacts of worker arrangement selection on team performance for clearer decision-making by managers. Design/methodology/approach This study extracts stakeholder criteria weights using the best-worst method. The outputs are integrated with TOPSIS calculations to determine the optimal number of workers per group based on productivity and project needs. Furthermore, a hybrid metaheuristic algorithm combined with artificial neural networks is optimized to accurately estimate the impact of managerial decisions. Findings A case study was conducted using data from a construction project. Results significantly demonstrated the impact of project goal orientation and stakeholder criteria on prioritizing workforce sizes for achieving maximum productivity. The intelligent model adapts to changing project conditions. In addition, an optimal combination of candidate metaheuristics with neural networks was achieved for accurately estimating the impacts of worker arrangements. Practical implications This dynamic multi-objective model facilitates optimal productivity aligned with stakeholder goals and current project conditions, providing informed insights for managers. Originality/value This model presents an intelligent, knowledge-based approach addressing the unique and dynamic environments of projects to enhance workforce productivity while offering reliable forecasts applicable across diverse construction activities.

Authors

Institutions

Publication Details

Journal
Construction Innovation
Published
2026-06-27
DOI
https://doi.org/10.1108/ci-09-2024-0281
Primary Topic
Resource-Constrained Project Scheduling
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Multi-objective intelligent model for optimizing labor allocation in construction projects

Hamideh Rabiei
Construction Innovation
Resource-Constrained Project Scheduling
article

Multi-objective intelligent model for optimizing labor allocation in construction projects

Hamideh Rabiei
article en

Abstract

Purpose Typically, the number of workers per team is determined based on experience. This study aims to propose an integrated intelligent model aimed at reducing lost productivity and optimizing team sizes in construction projects to align with stakeholder interests and project objectives. The model focuses on maximizing profit and minimizing loss under the current project conditions and available resources. Subsequently, the model provides reliable estimates of the necessary information and the impacts of worker arrangement selection on team performance for clearer decision-making by managers. Design/methodology/approach This study extracts stakeholder criteria weights using the best-worst method. The outputs are integrated with TOPSIS calculations to determine the optimal number of workers per group based on productivity and project needs. Furthermore, a hybrid metaheuristic algorithm combined with artificial neural networks is optimized to accurately estimate the impact of managerial decisions. Findings A case study was conducted using data from a construction project. Results significantly demonstrated the impact of project goal orientation and stakeholder criteria on prioritizing workforce sizes for achieving maximum productivity. The intelligent model adapts to changing project conditions. In addition, an optimal combination of candidate metaheuristics with neural networks was achieved for accurately estimating the impacts of worker arrangements. Practical implications This dynamic multi-objective model facilitates optimal productivity aligned with stakeholder goals and current project conditions, providing informed insights for managers. Originality/value This model presents an intelligent, knowledge-based approach addressing the unique and dynamic environments of projects to enhance workforce productivity while offering reliable forecasts applicable across diverse construction activities.

Construction Innovation
Iran University of Science and Technology (IR)
Decent work and economic growth
Openalex Percentile: Top 4%
Resource-Constrained Project Scheduling
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.