Electrical Demand Uplift and Coil Performance Constraints in Air-Source Heat Pump Retrofits for Commercial Office Buildings

Decarbonising existing commercial buildings requires replacing combustion-based heating systems with electrically driven alternatives such as air-source heat pumps (ASHPs). Although the energy and emissions benefits of heat pumps are well established, less attention has been given to the plant-level electrical demand uplift and hydronic constraints that can limit retrofit feasibility in existing buildings. This study quantifies the electrical demand uplift and air-handling unit (AHU) coil performance limitations associated with ASHP retrofitting in an existing Australian commercial office building. A peak design-load assessment was undertaken to compare the baseline gas-fired heating system with an electrified ASHP configuration under equivalent thermal load conditions. The principal electrical outcomes are derived from a specified 1900 kW Stage 3 plant-screening heating boundary. This boundary reflects the prevailing installed plant-screening condition, rather than the aggregate of scheduled AHU heating duties. First-principles energy balances and hydronic relationships were used to translate thermal demand into plant electrical demand under winter design conditions, while existing AHU heating coils were re-rated under low-temperature hydronic operation. The results show that baseline winter heating is associated with only a small auxiliary electrical load, whereas the governing baseline plant peak occurs during cooling at 399 kW. When referenced to the adopted 1900 kW Stage 3 installed-capacity screening boundary, the peak winter ASHP plant electrical demand increased to 956.66 kW, corresponding to an upper-bound electrical uplift of 557.7 kW relative to the governing baseline plant electrical demand. In parallel, low-temperature hydronic operation (55/45 °C) reduced AHU heating-coil capacity, requiring increased flow rates and, in many cases, coil modification to maintain scheduled duty. These findings indicate that, in the assessed case-study building, the principal barriers to ASHP retrofitting are not annual energy performance alone, but peak electrical infrastructure implications and hydronic system compatibility. The study therefore provides a transparent, building-scale screening methodology for assessing electrification feasibility in existing commercial buildings, while recognising that the reported numerical results are specific to the case-study building and stated design assumptions.

Authors

Institutions

Publication Details

Journal
Energies
Published
2026-06-26
DOI
https://doi.org/10.3390/en19133018
Primary Topic
Geothermal Energy Systems and Applications
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Electrical Demand Uplift and Coil Performance Constraints in Air-Source Heat Pump Retrofits for Commercial Office Buildings

Akhtar Kalam, Shasha Wang, Darren Kelly
Energies
Geothermal Energy Systems and Applications
article

Electrical Demand Uplift and Coil Performance Constraints in Air-Source Heat Pump Retrofits for Commercial Office Buildings

Akhtar Kalam, Shasha Wang, Darren Kelly
article en

Abstract

Decarbonising existing commercial buildings requires replacing combustion-based heating systems with electrically driven alternatives such as air-source heat pumps (ASHPs). Although the energy and emissions benefits of heat pumps are well established, less attention has been given to the plant-level electrical demand uplift and hydronic constraints that can limit retrofit feasibility in existing buildings. This study quantifies the electrical demand uplift and air-handling unit (AHU) coil performance limitations associated with ASHP retrofitting in an existing Australian commercial office building. A peak design-load assessment was undertaken to compare the baseline gas-fired heating system with an electrified ASHP configuration under equivalent thermal load conditions. The principal electrical outcomes are derived from a specified 1900 kW Stage 3 plant-screening heating boundary. This boundary reflects the prevailing installed plant-screening condition, rather than the aggregate of scheduled AHU heating duties. First-principles energy balances and hydronic relationships were used to translate thermal demand into plant electrical demand under winter design conditions, while existing AHU heating coils were re-rated under low-temperature hydronic operation. The results show that baseline winter heating is associated with only a small auxiliary electrical load, whereas the governing baseline plant peak occurs during cooling at 399 kW. When referenced to the adopted 1900 kW Stage 3 installed-capacity screening boundary, the peak winter ASHP plant electrical demand increased to 956.66 kW, corresponding to an upper-bound electrical uplift of 557.7 kW relative to the governing baseline plant electrical demand. In parallel, low-temperature hydronic operation (55/45 °C) reduced AHU heating-coil capacity, requiring increased flow rates and, in many cases, coil modification to maintain scheduled duty. These findings indicate that, in the assessed case-study building, the principal barriers to ASHP retrofitting are not annual energy performance alone, but peak electrical infrastructure implications and hydronic system compatibility. The study therefore provides a transparent, building-scale screening methodology for assessing electrification feasibility in existing commercial buildings, while recognising that the reported numerical results are specific to the case-study building and stated design assumptions.

EnergiesVol. 19(13)
Central Institute of Technology (AU), Department of the Premier and Cabinet (AU)
Industry, innovation and infrastructure
Openalex Percentile: Top 19%
Geothermal Energy Systems and Applications
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.