Adaptive Contract Governance: Stabilizing Construction Project Performance against Macroeconomic Volatility Using Smart Contract Automation

Effectively managing construction projects requires governance processes that can respond to rapid changes in macroeconomic conditions. Inflation, supply chain stress, and interest rate shocks introduce external pressures that traditional contract structures often fail to absorb. Sequential approvals, delayed payments, and slow dispute pathways create contractual frictions that accumulate over time and intensify cost escalation, schedule delay, and cash-flow strain. This study examines how automation-enabled governance mechanisms, modeled as smart contract functionalities, can reduce these frictions during volatile periods. A system dynamics model representing a generalized construction project integrates macroeconomic drivers with feedback processes associated with payment timing, administrative responsiveness, information delay, and dispute latency to assess how automation influences the propagation of shocks across project systems. Scenario simulations reflecting conditions from 2019 to 2023 show that targeted reductions in contractual delays can lower execution-stage cost escalation by approximately 15%–20% and reduce total project-level cost overruns by 5%–6%, while also moderating schedule delay and dispute escalation. The degree of stabilization depends on the severity of external shocks, yet the results demonstrate that automation-oriented governance mechanisms enhance system responsiveness by modifying the timing of corrective action within core feedback loops. By quantifying how digital automation reshapes governance delays under volatility, this study extends prior system dynamics and smart contract research and provides a quantitative basis for adaptive contract governance strategies aimed at enhancing project resilience.

Authors

Institutions

Publication Details

Journal
Journal of Management in Engineering
Published
2026-06-26
DOI
https://doi.org/10.1061/jmenea.meeng-7491
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Adaptive Contract Governance: Stabilizing Construction Project Performance against Macroeconomic Volatility Using Smart Contract Automation

Gabriel Castelblanco, Erfan Moayyed, Chimay Anumba
Journal of Management in Engineering
Construction Project Management and Performance
article

Adaptive Contract Governance: Stabilizing Construction Project Performance against Macroeconomic Volatility Using Smart Contract Automation

Gabriel Castelblanco, Erfan Moayyed, Chimay Anumba
article en

Abstract

Effectively managing construction projects requires governance processes that can respond to rapid changes in macroeconomic conditions. Inflation, supply chain stress, and interest rate shocks introduce external pressures that traditional contract structures often fail to absorb. Sequential approvals, delayed payments, and slow dispute pathways create contractual frictions that accumulate over time and intensify cost escalation, schedule delay, and cash-flow strain. This study examines how automation-enabled governance mechanisms, modeled as smart contract functionalities, can reduce these frictions during volatile periods. A system dynamics model representing a generalized construction project integrates macroeconomic drivers with feedback processes associated with payment timing, administrative responsiveness, information delay, and dispute latency to assess how automation influences the propagation of shocks across project systems. Scenario simulations reflecting conditions from 2019 to 2023 show that targeted reductions in contractual delays can lower execution-stage cost escalation by approximately 15%–20% and reduce total project-level cost overruns by 5%–6%, while also moderating schedule delay and dispute escalation. The degree of stabilization depends on the severity of external shocks, yet the results demonstrate that automation-oriented governance mechanisms enhance system responsiveness by modifying the timing of corrective action within core feedback loops. By quantifying how digital automation reshapes governance delays under volatility, this study extends prior system dynamics and smart contract research and provides a quantitative basis for adaptive contract governance strategies aimed at enhancing project resilience.

Journal of Management in EngineeringVol. 42(5)
University of Florida (US)
Openalex Percentile: Top 4%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Adaptive Contract Governance: Stabilizing Construction Project Performance against Macroeconomic Volatility Using Smart Contract Automation — Gabriel Castelblanco, Erfan Moayyed, et al. · Journal of Management in Engineering (2026) | TGRS Research Map | TGRS