Intelligent prediction of main-works construction duration for pumped storage power stations using small-sample machine learning

Purpose Pumped storage has become widely recognized as one of the major technical options for power system regulation, and its development is considered important, necessary, and urgent across the industry. Construction duration prediction is a key component of schedule management for pumped-storage power station projects. However, owing to the limited number of completed stations and confidentiality restrictions, existing studies perform poorly under small-sample conditions. Design/methodology/approach This study proposes an intelligent prediction model for the construction duration of the main works of pumped-storage power stations by integrating similarity-based project selection with small-sample machine learning. First, highly relevant factors are selected from a large number of candidate factors affecting construction duration. Second, based on the kernelized angular measure method, both scale differences and structural proportional differences are jointly considered to identify similar projects. Finally, an intelligent prediction model for the construction duration of the main works is developed based on Improved Harris Hawks Optimization and Least Squares Support Vector Machine. Findings This study identifies seven major factors affecting the construction duration of pumped-storage power stations, including installed capacity. Case studies further demonstrate that the proposed intelligent construction duration prediction method for small samples achieves a prediction accuracy of 95.46%, demonstrates good predictive performance on the test dataset, meets the accuracy requirements for construction duration planning, and significantly outperforms traditional construction duration prediction algorithms. Originality/value The main contribution of this study lies in integrating similarity-based computation with multiple machine learning methods to propose a construction duration prediction framework for pumped-storage power stations under small-sample conditions, enabling accurate capture of the complex nonlinear relationships between influencing factors and construction duration, significantly improving the accuracy and efficiency of construction duration prediction, and providing a useful reference for the rational planning of construction organization in pumped-storage power station projects.

Authors

Institutions

Publication Details

Journal
Engineering Construction & Architectural Management
Published
2026-06-26
DOI
https://doi.org/10.1108/ecam-01-2026-0131
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Intelligent prediction of main-works construction duration for pumped storage power stations using small-sample machine learning

Xiangtian Nie, Tianyu Fan, Qikai Li, Bo Wang et al.
Engineering Construction & Architectural Management
Construction Project Management and Performance
article

Intelligent prediction of main-works construction duration for pumped storage power stations using small-sample machine learning

Xiangtian Nie, Tianyu Fan, Qikai Li, Bo Wang, Anlan Li, Hao Dong
article en

Abstract

Purpose Pumped storage has become widely recognized as one of the major technical options for power system regulation, and its development is considered important, necessary, and urgent across the industry. Construction duration prediction is a key component of schedule management for pumped-storage power station projects. However, owing to the limited number of completed stations and confidentiality restrictions, existing studies perform poorly under small-sample conditions. Design/methodology/approach This study proposes an intelligent prediction model for the construction duration of the main works of pumped-storage power stations by integrating similarity-based project selection with small-sample machine learning. First, highly relevant factors are selected from a large number of candidate factors affecting construction duration. Second, based on the kernelized angular measure method, both scale differences and structural proportional differences are jointly considered to identify similar projects. Finally, an intelligent prediction model for the construction duration of the main works is developed based on Improved Harris Hawks Optimization and Least Squares Support Vector Machine. Findings This study identifies seven major factors affecting the construction duration of pumped-storage power stations, including installed capacity. Case studies further demonstrate that the proposed intelligent construction duration prediction method for small samples achieves a prediction accuracy of 95.46%, demonstrates good predictive performance on the test dataset, meets the accuracy requirements for construction duration planning, and significantly outperforms traditional construction duration prediction algorithms. Originality/value The main contribution of this study lies in integrating similarity-based computation with multiple machine learning methods to propose a construction duration prediction framework for pumped-storage power stations under small-sample conditions, enabling accurate capture of the complex nonlinear relationships between influencing factors and construction duration, significantly improving the accuracy and efficiency of construction duration prediction, and providing a useful reference for the rational planning of construction organization in pumped-storage power station projects.

Engineering Construction & Architectural Management
North China University of Water Resources and Electric Power (CN), Taishan University (CN)
Natural Science Foundation of Henan Province
Industry, innovation and infrastructure
Openalex Percentile: Top 4%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.