Optimization of Multi-Building Tower Crane Scheduling for Lean Prefabricated Construction

Tower cranes (TCs) as essential lifting equipment in construction engineering, play a critical role in prefabricated buildings (PBs). However, current construction scheduling primarily relies on manual observation and operator experience to execute repetitive tasks, leading to low efficiency, heavy workload, and potential safety risks. In typical PB construction projects, multiple buildings are often constructed in parallel, where each TC is assigned to serve a specific group of buildings independently. This allocation strategy is generally predetermined by the site layout plan to ensure operational safety and avoid inter-crane interference. To enhance lean construction performance and management efficiency in PBs, this study develops a scheduling optimization model that explicitly considers the initial hook position and the specific locations of prefabricated component (PC) supply and demand points. The proposed model is solved and compared using three meta-heuristic algorithms, including Particle Swarm Optimization (PSO), Genetic Algorithm (GA), and Artificial Bee Colony (ABC). Numerical results indicate that PSO outperforms GA and ABC in terms of convergence speed and cost minimization performance. After optimization, the operating times of two TCs are reduced by 23.94% and 12.16%, respectively, saving ¥207.29 and ¥293.96 per day in operating costs, and reducing total construction cost by approximately 8.0%. These results demonstrate that the proposed model can effectively improve construction efficiency and support lean management under the considered planning assumptions.

Authors

Institutions

Publication Details

Journal
Buildings
Published
2026-06-25
DOI
https://doi.org/10.3390/buildings16132528
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimization of Multi-Building Tower Crane Scheduling for Lean Prefabricated Construction

Zhenyu Mei, Chao Zou, Jiwei Zhu, Kui Zhou et al.
Buildings
BIM and Construction Integration
article

Optimization of Multi-Building Tower Crane Scheduling for Lean Prefabricated Construction

Zhenyu Mei, Chao Zou, Jiwei Zhu, Kui Zhou, Qirui Wang, Xingyu Quan, Zhanfeng Wang
article en

Abstract

Tower cranes (TCs) as essential lifting equipment in construction engineering, play a critical role in prefabricated buildings (PBs). However, current construction scheduling primarily relies on manual observation and operator experience to execute repetitive tasks, leading to low efficiency, heavy workload, and potential safety risks. In typical PB construction projects, multiple buildings are often constructed in parallel, where each TC is assigned to serve a specific group of buildings independently. This allocation strategy is generally predetermined by the site layout plan to ensure operational safety and avoid inter-crane interference. To enhance lean construction performance and management efficiency in PBs, this study develops a scheduling optimization model that explicitly considers the initial hook position and the specific locations of prefabricated component (PC) supply and demand points. The proposed model is solved and compared using three meta-heuristic algorithms, including Particle Swarm Optimization (PSO), Genetic Algorithm (GA), and Artificial Bee Colony (ABC). Numerical results indicate that PSO outperforms GA and ABC in terms of convergence speed and cost minimization performance. After optimization, the operating times of two TCs are reduced by 23.94% and 12.16%, respectively, saving ¥207.29 and ¥293.96 per day in operating costs, and reducing total construction cost by approximately 8.0%. These results demonstrate that the proposed model can effectively improve construction efficiency and support lean management under the considered planning assumptions.

BuildingsVol. 16(13)
Xi'an University of Architecture and Technology (CN), China Communications Construction Company (China) (CN), Xi'an University of Technology (CN), China Railway Group (China) (CN)
Xi'an Municipal Bureau of Science and Technology, Shaanxi Provincial Science and Technology Department
Openalex Percentile: Top 10%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.