Engineering Visual Presentation E01: Unlocking value from Surat Basin wells through innovative well completions, solids management, and intervention practices

Engineering Visual Presentation E01 Since the commencement of production in 2014, Shell’s Queensland Gas Company (QGC) Surat Basin coal seam gas asset has been constrained by high well intervention demands, materially impacting production availability and operating cost as the well population matured. Intervention demand has been driven primarily by solids-related artificial lift system failures, well cleanouts, and increasing integrity monitoring and remediation requirements. In response, QGC initiated a multi-year improvement program focused on unlocking additional value from the existing well stock. The program addressed solids-driven reliability limitations, emerging well integrity risks, and intervention efficiency through integrated changes to well completion design, solids control, operating practices, and intervention strategies across the production fleet. Key initiatives included the deployment of retrofit in-situ solids control technologies to stabilise open hole completions, basin-specific limited-fluid and live-well workover practices to minimise reservoir disturbance, and a revised well integrity management approach combining fitness-for-service assessments with expandable casing remediation technologies. In parallel, a suite of rigless and lean intervention techniques were introduced to address well-understood failure modes without pulling pumped completions, materially reducing execution time, cost and operational risk. Collectively, these initiatives reduced pumped well failure frequency, improved post-intervention production recovery, and lowered overall intervention intensity. By the end of 2025, average pumped well mean time to failure increased to 1852 days, compared with 1050 days in January 2023. Rig-based workovers decreased by more than 150 activities per year despite overall well stock growth, and gas production recovery following workovers was accelerated by a factor of three. To access the Visual Presentation click on 'Supplementary data' below. To read the full paper click here

Authors

Publication Details

Journal
Australian Energy Producers journal.
Published
2026-06-18
DOI
https://doi.org/10.1071/ep26478
Primary Topic
Oil and Gas Production Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Engineering Visual Presentation E01: Unlocking value from Surat Basin wells through innovative well completions, solids management, and intervention practices

Alexander Robinson, Angus Stirling
Australian Energy Producers journal.
Oil and Gas Production Techniques
article

Engineering Visual Presentation E01: Unlocking value from Surat Basin wells through innovative well completions, solids management, and intervention practices

Alexander Robinson, Angus Stirling
article en

Abstract

Engineering Visual Presentation E01 Since the commencement of production in 2014, Shell’s Queensland Gas Company (QGC) Surat Basin coal seam gas asset has been constrained by high well intervention demands, materially impacting production availability and operating cost as the well population matured. Intervention demand has been driven primarily by solids-related artificial lift system failures, well cleanouts, and increasing integrity monitoring and remediation requirements. In response, QGC initiated a multi-year improvement program focused on unlocking additional value from the existing well stock. The program addressed solids-driven reliability limitations, emerging well integrity risks, and intervention efficiency through integrated changes to well completion design, solids control, operating practices, and intervention strategies across the production fleet. Key initiatives included the deployment of retrofit in-situ solids control technologies to stabilise open hole completions, basin-specific limited-fluid and live-well workover practices to minimise reservoir disturbance, and a revised well integrity management approach combining fitness-for-service assessments with expandable casing remediation technologies. In parallel, a suite of rigless and lean intervention techniques were introduced to address well-understood failure modes without pulling pumped completions, materially reducing execution time, cost and operational risk. Collectively, these initiatives reduced pumped well failure frequency, improved post-intervention production recovery, and lowered overall intervention intensity. By the end of 2025, average pumped well mean time to failure increased to 1852 days, compared with 1050 days in January 2023. Rig-based workovers decreased by more than 150 activities per year despite overall well stock growth, and gas production recovery following workovers was accelerated by a factor of three. To access the Visual Presentation click on 'Supplementary data' below. To read the full paper click here

Australian Energy Producers journal.Vol. 66(S2)
Openalex Percentile: Top 7%
Oil and Gas Production Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.