Session 10. Oral Presentation for: Securing reliable energy for east coast Australia: Golden Beach gas field development and seasonal storage

Presented on 20 May 2026: Session 10 GB Energy is advancing the Golden Beach gas field development in Victoria’s offshore Gippsland Basin – a landmark energy storage project set to deliver vital dispatchable energy and supply flexibility to Australia’s East Coast domestic gas market. Positioned beside the Longford Gas Hub, Golden Beach will help stabilise the market and strengthen reliability through the energy transition. First discovered in 1967 (GB-1A), the field has been progressively de-risked, with a modern 3D seismic survey in 2018 and new appraisal drilling in 2023 (GB-2). This comprehensive dataset, complemented by analogues from other Gippsland Basin fields, provides a robust foundation for understanding the reservoir and unlocking its full development potential. The project’s innovation is to operate the field as a seasonal storage facility before progressing to ultimate depletion. Unlike most storage projects globally, Golden Beach is purpose-designed from a reservoir that has not been depleted, allowing for an optimised design that ensures reliable deliverability during periods of peak demand. This paper outlines the field development pathway – beginning with gas production, transitioning into a seasonal storage facility, and ultimately progressing to final blowdown. Extensive modelling and scenario testing show the resilient development across a wide range of market and subsurface conditions, ensuring well deliverability during peak seasonal demand. A carefully designed drilling and completion strategy, focused on reliability and flexibility, adds further confidence to project outcomes. Golden Beach is more than a robust technical development. It is critical energy infrastructure that safeguards supply, provides flexibility, and underpins a smooth and orderly transition for Australia’s energy market. To access the Oral Presentation click ‘Supplementary data’ below. To read the full paper click here

Authors

Institutions

Publication Details

Journal
Australian Energy Producers journal.
Published
2026-06-18
DOI
https://doi.org/10.1071/ep26458
Primary Topic
Marine and Offshore Engineering Studies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Session 10. Oral Presentation for: Securing reliable energy for east coast Australia: Golden Beach gas field development and seasonal storage

Moh Bagheri
Australian Energy Producers journal.
Marine and Offshore Engineering Studies
article

Session 10. Oral Presentation for: Securing reliable energy for east coast Australia: Golden Beach gas field development and seasonal storage

Moh Bagheri
article en

Abstract

Presented on 20 May 2026: Session 10 GB Energy is advancing the Golden Beach gas field development in Victoria’s offshore Gippsland Basin – a landmark energy storage project set to deliver vital dispatchable energy and supply flexibility to Australia’s East Coast domestic gas market. Positioned beside the Longford Gas Hub, Golden Beach will help stabilise the market and strengthen reliability through the energy transition. First discovered in 1967 (GB-1A), the field has been progressively de-risked, with a modern 3D seismic survey in 2018 and new appraisal drilling in 2023 (GB-2). This comprehensive dataset, complemented by analogues from other Gippsland Basin fields, provides a robust foundation for understanding the reservoir and unlocking its full development potential. The project’s innovation is to operate the field as a seasonal storage facility before progressing to ultimate depletion. Unlike most storage projects globally, Golden Beach is purpose-designed from a reservoir that has not been depleted, allowing for an optimised design that ensures reliable deliverability during periods of peak demand. This paper outlines the field development pathway – beginning with gas production, transitioning into a seasonal storage facility, and ultimately progressing to final blowdown. Extensive modelling and scenario testing show the resilient development across a wide range of market and subsurface conditions, ensuring well deliverability during peak seasonal demand. A carefully designed drilling and completion strategy, focused on reliability and flexibility, adds further confidence to project outcomes. Golden Beach is more than a robust technical development. It is critical energy infrastructure that safeguards supply, provides flexibility, and underpins a smooth and orderly transition for Australia’s energy market. To access the Oral Presentation click ‘Supplementary data’ below. To read the full paper click here

Australian Energy Producers journal.Vol. 66(S2)
EnergyAustralia (Australia) (AU)
Industry, innovation and infrastructure
Openalex Percentile: Top 7%
Marine and Offshore Engineering Studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.