An integrated framework for understanding near misses in construction: evidence from a systematic analysis of antecedents, consequences and control measures

Purpose Near misses in the construction industry act as critical early warnings of potential hazards, they profoundly reveal the underlying risks within the construction system. Despite extensive attention, existing research remains fragmented and limited in perspective. Therefore, this study aims to fill this gap by systematically summarizing and analyzing antecedents, consequences and control measures of near misses, helping to determine future research directions and providing reliable suggestions that combine theory and practice. Design/methodology/approach During the research process, research followed the preferred reporting items for systematic reviews and meta-analyses (PRISMA) guidelines and identified 48 articles for systematic review. Bow-tie Analysis (BTA) was then applied to code tertiary factors concerning antecedents, consequences, and control measures, forming the concept of a near-miss lifecycle management (NMLM). Findings Findings reveal insufficient practical competence as a primary antecedent, with significant consequences including injuries and increased accident rates. Besides, current control measures focus on retrospective adjustments. Originality/value This study aims to provide researchers and construction safety practitioners with a comprehensive knowledge framework for near misses and enable people to correctly face and handle them in different situations. Furthermore, based on the research results, research hopes that researchers will take proactive preventive measures rather than passively accept and handle them, in order to effectively reduce potential accidents and significantly improve the overall safety management level of the industry.

Authors

Institutions

Publication Details

Journal
Engineering Construction & Architectural Management
Published
2026-06-18
DOI
https://doi.org/10.1108/ecam-12-2025-2057
Primary Topic
Occupational Health and Safety Research
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

An integrated framework for understanding near misses in construction: evidence from a systematic analysis of antecedents, consequences and control measures

Lingna Lin, Yangyang Pan
Engineering Construction & Architectural Management
Occupational Health and Safety Research
article

An integrated framework for understanding near misses in construction: evidence from a systematic analysis of antecedents, consequences and control measures

Lingna Lin, Yangyang Pan
article en

Abstract

Purpose Near misses in the construction industry act as critical early warnings of potential hazards, they profoundly reveal the underlying risks within the construction system. Despite extensive attention, existing research remains fragmented and limited in perspective. Therefore, this study aims to fill this gap by systematically summarizing and analyzing antecedents, consequences and control measures of near misses, helping to determine future research directions and providing reliable suggestions that combine theory and practice. Design/methodology/approach During the research process, research followed the preferred reporting items for systematic reviews and meta-analyses (PRISMA) guidelines and identified 48 articles for systematic review. Bow-tie Analysis (BTA) was then applied to code tertiary factors concerning antecedents, consequences, and control measures, forming the concept of a near-miss lifecycle management (NMLM). Findings Findings reveal insufficient practical competence as a primary antecedent, with significant consequences including injuries and increased accident rates. Besides, current control measures focus on retrospective adjustments. Originality/value This study aims to provide researchers and construction safety practitioners with a comprehensive knowledge framework for near misses and enable people to correctly face and handle them in different situations. Furthermore, based on the research results, research hopes that researchers will take proactive preventive measures rather than passively accept and handle them, in order to effectively reduce potential accidents and significantly improve the overall safety management level of the industry.

Engineering Construction & Architectural Management
Suzhou University of Science and Technology (CN)
Industry, innovation and infrastructure
Openalex Percentile: Top 6%
Occupational Health and Safety Research
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

An integrated framework for understanding near misses in construction: evidence from a systematic analysis of antecedents, consequences and control measures — Lingna Lin, Yangyang Pan · Engineering Construction & Architectural Management (2026) | TGRS Research Map | TGRS