Dynamic Allocation of Critical Chain Buffers for Multi-objective Optimization and Project Schedule Risk Management
Considering duration, cost, and quality constraints, this study develops a multi-objective optimization model for project scheduling. The framework employs trapezoidal fuzzy numbers to characterize activity durations and a bell-shaped function to define the duration-quality trade-off. An optimal schedule is derived using a genetic algorithm. To mitigate uncertainties in construction progress, four duration risk categories—resource, operational, human, and environmental—are quantified through risk coefficients and weighting factors to establish a robust buffer sizing mechanism. Upon 50% completion of the planned workload, a grey GM(1,1) model is implemented to forecast activity finish times based on real-time progress monitoring. Furthermore, a dynamic buffer allocation model is established by integrating initial buffers, early completion gains, and cumulative buffer consumption. Application to a pumped storage power station project demonstrates that the proposed method reduces the total duration by 18 days, confirming its efficiency and practical utility in complex engineering environments.
Authors
- Tianyu Fan (ORCID: https://orcid.org/0009-0003-1568-4695)
- Xueqing Zhang (ORCID: https://orcid.org/0000-0002-7310-3858)
- Dongke Li
- Jikun Zhang
- Zhiqiang Fu
- Xiangtian Nie
- Hongzhe Qin
- Shiwei Ding
Institutions
- State Grid Corporation of China (China) (CN)
- North China University of Water Resources and Electric Power (CN)
- Taishan University (CN)
- Taishan Medical University (CN)
Publication Details
- Journal
- International Journal of Computational Intelligence Systems
- Published
- 2026-06-18
- DOI
- https://doi.org/10.1007/s44196-026-01425-6
- Primary Topic
- Resource-Constrained Project Scheduling
- Type
- article
- Field-Weighted Citation Impact
- 0.00