We Discovered a Method That Cuts Data Center Energy Costs by 30% 3ms Latency, 0.17ms Recovery, and 113 TWh/Year: The End of Waste
An adaptive controller was tested on a massively parallel architecture with 10,240 cores. Three definitive tests were conducted: allocation latency, failure resilience, and performance under realistic workload. Results:- P99 latency: 3.08 ms (meets real-time inference requirements)- Task redistribution after cluster failure: 0.17 ms- Control overhead under real trace (36,470 requests): < 5% The method can reduce data center energy consumption by 20-30%, equivalent to 113-120 TWh annually.
Authors
- SERGIO ROBERTO MACHADO (ORCID: https://orcid.org/0009-0006-7179-8058)
Publication Details
- Journal
- Zenodo (CERN European Organization for Nuclear Research)
- Published
- 2026-06-18
- DOI
- https://doi.org/10.5281/zenodo.20751116
- Primary Topic
- Cloud Computing and Resource Management
- Type
- article
- Field-Weighted Citation Impact
- 0.00