Session 11. Oral Presentation for: Decommissioning without a rig: P&A of remote platform wells using a W2W supply vessel

Presented on 20 May 2026: Session 11 In 2023, Esso Australia successfully executed a plug and abandonment (P&A) campaign on the Perch and Dolphin monopod platforms in the Bass Strait. Faced with a spatially constrained offshore environment, the Wells Team partnered with Upstream Supply Chain to develop and engage a multi-purpose supply vessel (MPSV) with Walk to Work (W2W) capability. Both platforms were unstaffed and posed significant logistical and access challenges. The MPSV functioned as a supply vessel, with additional capability including living quarters, helideck, heave-compensated crane and W2W gangway for personnel transfer to and from the platform. A cement flowline was routed across the W2W gangway and connected via a high-pressure dry break to a corresponding flowline on each monopod. Utility lines for power, water and air were similarly deployed. The wells were killed by bullheading fluid through the cementing flowline and a slickline unit – positioned on the cellar deck of the monopod – installed mechanical plugs to secure the wells. The reservoirs were permanently abandoned by pumping through-tubing cement plugs through perforations in tubing made above the production packers. Subsequent pressure tests and top-of-cement tags verified accurate barrier placement. This campaign, completed using a novel approach, not only met regulatory requirements but also replaced scope originally planned for a jack-up rig, delivering substantial cost savings and logistical efficiencies. A detailed vessel and equipment selection process, supported by modelling, enabled the use of a versatile, dynamically positioned vessel – delivering effective execution in a challenging environment and setting a benchmark for future P&A operations on similar offshore infrastructure. To access the Oral Presentation click ‘Supplementary data’ below. To read the full paper click here

Authors

Institutions

Publication Details

Journal
Australian Energy Producers journal.
Published
2026-06-18
DOI
https://doi.org/10.1071/ep26442
Primary Topic
Marine and Offshore Engineering Studies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Session 11. Oral Presentation for: Decommissioning without a rig: P&A of remote platform wells using a W2W supply vessel

Matt Barney, Jo King
Australian Energy Producers journal.
Marine and Offshore Engineering Studies
article

Session 11. Oral Presentation for: Decommissioning without a rig: P&A of remote platform wells using a W2W supply vessel

Matt Barney, Jo King
article en

Abstract

Presented on 20 May 2026: Session 11 In 2023, Esso Australia successfully executed a plug and abandonment (P&A) campaign on the Perch and Dolphin monopod platforms in the Bass Strait. Faced with a spatially constrained offshore environment, the Wells Team partnered with Upstream Supply Chain to develop and engage a multi-purpose supply vessel (MPSV) with Walk to Work (W2W) capability. Both platforms were unstaffed and posed significant logistical and access challenges. The MPSV functioned as a supply vessel, with additional capability including living quarters, helideck, heave-compensated crane and W2W gangway for personnel transfer to and from the platform. A cement flowline was routed across the W2W gangway and connected via a high-pressure dry break to a corresponding flowline on each monopod. Utility lines for power, water and air were similarly deployed. The wells were killed by bullheading fluid through the cementing flowline and a slickline unit – positioned on the cellar deck of the monopod – installed mechanical plugs to secure the wells. The reservoirs were permanently abandoned by pumping through-tubing cement plugs through perforations in tubing made above the production packers. Subsequent pressure tests and top-of-cement tags verified accurate barrier placement. This campaign, completed using a novel approach, not only met regulatory requirements but also replaced scope originally planned for a jack-up rig, delivering substantial cost savings and logistical efficiencies. A detailed vessel and equipment selection process, supported by modelling, enabled the use of a versatile, dynamically positioned vessel – delivering effective execution in a challenging environment and setting a benchmark for future P&A operations on similar offshore infrastructure. To access the Oral Presentation click ‘Supplementary data’ below. To read the full paper click here

Australian Energy Producers journal.Vol. 66(S2)
Collins College (US), ExxonMobil (United States) (US)
Industry, innovation and infrastructure
Openalex Percentile: Top 8%
Marine and Offshore Engineering Studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Session 11. Oral Presentation for: Decommissioning without a rig: P&A of remote platform wells using a W2W supply vessel — Matt Barney, Jo King · Australian Energy Producers journal. (2026) | TGRS Research Map | TGRS