D1.1 - Report on initial process modelling of biomass-to-MeOH pilot plant

The BeBOP pilot plant will be built and operated at VTT (Finland) and will combine a gasification unit, syngas purification, syngas conditioning performed by a SOC unit, compression and MeOH synthesis. Since SOC and MeOH have to be integrated in the existing VTT facilities, the system is subject to constraints associated with the existing equipment. From the preliminary investigation, several options have been investigated, regarding:• Syngas composition, influenced by the biomass and inert gas used for gasifier operation.• Limitations on available syngas for synthesis, introduced by the capacity of the existing equipment.• The available cell surfaces in the SOC unit, affecting the oxygen extraction capacity and the syngas conditioning capability.• The possibility of syngas storage to decouple the syngas flow rates through the SOC and the MeOH units, compensating for some of the previous limitations. A simplified model of the integrated TRL6 pilot process has been developed. The results showed the capacity to reach the assumed 70% carbon conversion target for the pilot plant, with different MeOH productivity values that depend on the design choices. The amount of steam addition and the possibility of hydrogen injection from external sources influence the performance of the process and the sizing of the components.

Authors

Institutions

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-06-17
DOI
https://doi.org/10.5281/zenodo.20729024
Primary Topic
Catalysts for Methane Reforming
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

D1.1 - Report on initial process modelling of biomass-to-MeOH pilot plant

Matteo C. Romano, Giulio Guandalini
Zenodo (CERN European Organization for Nuclear Research)
Catalysts for Methane Reforming
article

D1.1 - Report on initial process modelling of biomass-to-MeOH pilot plant

Matteo C. Romano, Giulio Guandalini
article en

Abstract

The BeBOP pilot plant will be built and operated at VTT (Finland) and will combine a gasification unit, syngas purification, syngas conditioning performed by a SOC unit, compression and MeOH synthesis. Since SOC and MeOH have to be integrated in the existing VTT facilities, the system is subject to constraints associated with the existing equipment. From the preliminary investigation, several options have been investigated, regarding:• Syngas composition, influenced by the biomass and inert gas used for gasifier operation.• Limitations on available syngas for synthesis, introduced by the capacity of the existing equipment.• The available cell surfaces in the SOC unit, affecting the oxygen extraction capacity and the syngas conditioning capability.• The possibility of syngas storage to decouple the syngas flow rates through the SOC and the MeOH units, compensating for some of the previous limitations. A simplified model of the integrated TRL6 pilot process has been developed. The results showed the capacity to reach the assumed 70% carbon conversion target for the pilot plant, with different MeOH productivity values that depend on the design choices. The amount of steam addition and the possibility of hydrogen injection from external sources influence the performance of the process and the sizing of the components.

Zenodo (CERN European Organization for Nuclear Research)
Politecnico di Milano (IT)
European Commission
Openalex Percentile: Top 19%
Catalysts for Methane Reforming
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

D1.1 - Report on initial process modelling of biomass-to-MeOH pilot plant — Matteo C. Romano, Giulio Guandalini · Zenodo (CERN European Organization for Nuclear Research) (2026) | TGRS Research Map | TGRS