Contractual Risks and Dispute Escalation in Construction Firms Lacking Dedicated Contracts and Claims Management Team

Many construction companies operate without a dedicated contracts management team, exposing them to severe contractual risks and disputes. Assigning such a team is often perceived as a dispensable luxury that increases costs and lessens profit—until the absence of such expertise proves more costly. This paper presents a case study examining the contractual and dispute resolution challenges faced by an mechanical, electrical, and plumbing (MEP) subcontractor in Saudi Arabia, working under a fairly unbalanced subcontract with a contractor of higher contracts management expertise. Spotlighting the judgment in Tecnicas Reunidas v. Petroleum Chemicals and Mining Company (2025) England and Wales High Court (EWHC) 1785 (Comm), contract documents, project records, and interviews with managers and external legal advisors, the analysis identified key issues such as conflicts and discrepancies within the contract documents, tight time-barring provisions, and unclear and contradicting arbitration agreement. Disputes arose from disagreements on some projects’ execution processes to conflicts regarding the arbitration seat and the applicable governing law highlighted weak communication protocols and limited familiarity with alternative dispute resolution (ADR). It is concluded that the presence of a reliable proactive contracts management team plays a critical role throughout the contract life cycle, even during the tendering phase before signature. Lessons from this case study offer practical guidance for contractors willing to enhance dispute avoidance and resolution in similar cases.

Authors

Institutions

Publication Details

Journal
Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Published
2026-06-14
DOI
https://doi.org/10.1061/jladah.ladr-1615
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Contractual Risks and Dispute Escalation in Construction Firms Lacking Dedicated Contracts and Claims Management Team

Hazem Khaled Aboulata Mohamed, Ola D. Elmonayeri, Mohamed Mohsen Ahmed El-Dafrawi, Ahmed Yahya El Sayed
Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Construction Project Management and Performance
article

Contractual Risks and Dispute Escalation in Construction Firms Lacking Dedicated Contracts and Claims Management Team

Hazem Khaled Aboulata Mohamed, Ola D. Elmonayeri, Mohamed Mohsen Ahmed El-Dafrawi, Ahmed Yahya El Sayed
article en

Abstract

Many construction companies operate without a dedicated contracts management team, exposing them to severe contractual risks and disputes. Assigning such a team is often perceived as a dispensable luxury that increases costs and lessens profit—until the absence of such expertise proves more costly. This paper presents a case study examining the contractual and dispute resolution challenges faced by an mechanical, electrical, and plumbing (MEP) subcontractor in Saudi Arabia, working under a fairly unbalanced subcontract with a contractor of higher contracts management expertise. Spotlighting the judgment in Tecnicas Reunidas v. Petroleum Chemicals and Mining Company (2025) England and Wales High Court (EWHC) 1785 (Comm), contract documents, project records, and interviews with managers and external legal advisors, the analysis identified key issues such as conflicts and discrepancies within the contract documents, tight time-barring provisions, and unclear and contradicting arbitration agreement. Disputes arose from disagreements on some projects’ execution processes to conflicts regarding the arbitration seat and the applicable governing law highlighted weak communication protocols and limited familiarity with alternative dispute resolution (ADR). It is concluded that the presence of a reliable proactive contracts management team plays a critical role throughout the contract life cycle, even during the tendering phase before signature. Lessons from this case study offer practical guidance for contractors willing to enhance dispute avoidance and resolution in similar cases.

Journal of Legal Affairs and Dispute Resolution in Engineering and ConstructionVol. 18(3)
Arab Academy for Science, Technology, and Maritime Transport (EG), Salisbury University (US)
Openalex Percentile: Top 4%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Contractual Risks and Dispute Escalation in Construction Firms Lacking Dedicated Contracts and Claims Management Team — Hazem Khaled Aboulata Mohamed, Ola D. Elmonayeri, et al. · Journal of Legal Affairs and Dispute Resolution in Engineering and Construction (2026) | TGRS Research Map | TGRS