BIM-Integrated Multi-Objective Optimisation of Prefabricated Construction Configurations: A WBS-Based Generative Decomposition Framework

Building Information Modelling (BIM) workflows for prefabricated construction lack mechanisms that generate and compare alternative component configurations directly from a design model. Existing approaches define the optimisation search space manually and outside the model, address only one or two criteria, and treat the Work Breakdown Structure (WBS) as a post-design planning tool. This paper reinterprets the WBS as a generative decomposition mechanism. A WBS Engine decomposes the geometry of an existing BIM model into prefabricated subsystems before design decisions are fixed, producing the search space for optimisation without manual parametrisation. A Scenario Evaluator queries a database of 47 prefabricated components, and NSGA-II evaluates 60 configurations against four objectives. These are total cost, embodied carbon, assembly factor and number of lorry trips. Applied to a residential case study implemented in Dynamo, the prototype identified 16 non-dominated solutions. The best compromise configuration achieved a total cost of £150,444.01, 127,731.00 kgCO2e, an assembly factor of 0.190 and 10 lorry trips. Wall module size accounted for 17.4% of cost variation, while floor module size governed assembly complexity. The findings show that BIM-WBS integration with multi-objective optimisation supports informed early-stage decisions in industrialised construction.

Authors

Institutions

Publication Details

Journal
Buildings
Published
2026-06-14
DOI
https://doi.org/10.3390/buildings16122373
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

BIM-Integrated Multi-Objective Optimisation of Prefabricated Construction Configurations: A WBS-Based Generative Decomposition Framework

Sepehr Abrishami, Mayerlin Ramos Boada
Buildings
BIM and Construction Integration
article

BIM-Integrated Multi-Objective Optimisation of Prefabricated Construction Configurations: A WBS-Based Generative Decomposition Framework

Sepehr Abrishami, Mayerlin Ramos Boada
article en

Abstract

Building Information Modelling (BIM) workflows for prefabricated construction lack mechanisms that generate and compare alternative component configurations directly from a design model. Existing approaches define the optimisation search space manually and outside the model, address only one or two criteria, and treat the Work Breakdown Structure (WBS) as a post-design planning tool. This paper reinterprets the WBS as a generative decomposition mechanism. A WBS Engine decomposes the geometry of an existing BIM model into prefabricated subsystems before design decisions are fixed, producing the search space for optimisation without manual parametrisation. A Scenario Evaluator queries a database of 47 prefabricated components, and NSGA-II evaluates 60 configurations against four objectives. These are total cost, embodied carbon, assembly factor and number of lorry trips. Applied to a residential case study implemented in Dynamo, the prototype identified 16 non-dominated solutions. The best compromise configuration achieved a total cost of £150,444.01, 127,731.00 kgCO2e, an assembly factor of 0.190 and 10 lorry trips. Wall module size accounted for 17.4% of cost variation, while floor module size governed assembly complexity. The findings show that BIM-WBS integration with multi-objective optimisation supports informed early-stage decisions in industrialised construction.

BuildingsVol. 16(12)
University of Portsmouth (GB)
Openalex Percentile: Top 9%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

BIM-Integrated Multi-Objective Optimisation of Prefabricated Construction Configurations: A WBS-Based Generative Decomposition Framework — Sepehr Abrishami, Mayerlin Ramos Boada · Buildings (2026) | TGRS Research Map | TGRS