Multidimensional CCS deployment feasibility reshapes steel-hydrogen-power transitions in China’s 1.5°C pathway

Carbon capture and storage (CCS) is central to China's 1.5℃ pathway, yet pathway models often treat CCS availability as an aggregate condition rather than a provincial deployability condition that combines storage-side stock limits, annual injection-rate flow limits, and capture-side techno-economic factors. Here we represent CCS feasibility as this multidimensional deployability condition, separating cumulative storage resources, annual injection-rate capacity, cost decline, and second-generation CCS commercialization timing in a provincial-level, all-sector MESSAGEix-China model, and optimize China's carbon neutrality pathway across 36 scenarios. We find that annual injection-rate capacity becomes the earlier and more spatially widespread constraint on CCS deployment: compared with cumulative storage-capacity limits, injection-rate limits bind sooner, recur across more model periods, and affect more provinces. Once these flow boundaries bind, limited CCS space is reallocated across competing sectoral uses, changing the adjustment mechanism rather than only the aggregate scale of CCS. This scarcity propagates through a steel--hydrogen--power transmission chain. Tighter CCS feasibility reduces the space for CCS-dependent steel and fossil-hydrogen routes, accelerates steel-route substitution toward EAF and H$_2$-DRI, shifts hydrogen supply toward electrolysis, and increases the need for wind, solar, biomass power, and later BECCS. Biomass first expands as a low-carbon power source, while BECCS follows as negative-emissions demand rises. These results show that China's CCS bottleneck is not cumulative storage volume alone, but deployable provincial capacity governed by both stock and flow constraints. Planning CCS as a constrained system resource therefore requires attention to annual injection-rate build-out, regional source--sink coordination, and the cross-sectoral consequences of allocating limited storage space.

Authors

Institutions

Publication Details

Journal
iScience
Published
2026-11-19
DOI
https://doi.org/10.1016/j.isci.2026.118283
Primary Topic
Integrated Energy Systems Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Multidimensional CCS deployment feasibility reshapes steel-hydrogen-power transitions in China’s 1.5°C pathway

Songmin Yu, Ying Fan, Yukun Zhong, Zezheng Li
3 links
iScience
Integrated Energy Systems Optimization
article

Multidimensional CCS deployment feasibility reshapes steel-hydrogen-power transitions in China’s 1.5°C pathway

Songmin Yu, Ying Fan, Yukun Zhong, Zezheng Li
article en

Abstract

Carbon capture and storage (CCS) is central to China's 1.5℃ pathway, yet pathway models often treat CCS availability as an aggregate condition rather than a provincial deployability condition that combines storage-side stock limits, annual injection-rate flow limits, and capture-side techno-economic factors. Here we represent CCS feasibility as this multidimensional deployability condition, separating cumulative storage resources, annual injection-rate capacity, cost decline, and second-generation CCS commercialization timing in a provincial-level, all-sector MESSAGEix-China model, and optimize China's carbon neutrality pathway across 36 scenarios. We find that annual injection-rate capacity becomes the earlier and more spatially widespread constraint on CCS deployment: compared with cumulative storage-capacity limits, injection-rate limits bind sooner, recur across more model periods, and affect more provinces. Once these flow boundaries bind, limited CCS space is reallocated across competing sectoral uses, changing the adjustment mechanism rather than only the aggregate scale of CCS. This scarcity propagates through a steel--hydrogen--power transmission chain. Tighter CCS feasibility reduces the space for CCS-dependent steel and fossil-hydrogen routes, accelerates steel-route substitution toward EAF and H$_2$-DRI, shifts hydrogen supply toward electrolysis, and increases the need for wind, solar, biomass power, and later BECCS. Biomass first expands as a low-carbon power source, while BECCS follows as negative-emissions demand rises. These results show that China's CCS bottleneck is not cumulative storage volume alone, but deployable provincial capacity governed by both stock and flow constraints. Planning CCS as a constrained system resource therefore requires attention to annual injection-rate build-out, regional source--sink coordination, and the cross-sectoral consequences of allocating limited storage space.

iScienceVol. 29(12)
Peking University (CN), Beihang University (CN)
Climate action, Affordable and clean energy, Industry, innovation and infrastructure
Integrated Energy Systems Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon