A Comprehensive Risk Assessment Method For Shopping Malls

Shopping malls are structures that pose multidimensional risks in terms of occupational health and safety due to the high density of visitors and the simultaneous execution of many different activities. In this study, a two-step, integrated risk assessment method was developed for shopping malls and applied in a shopping mall located within the borders of Istanbul, serving approximately 50,000 visitors daily. In the first step of the proposed method, a total of 153 requirements were analyzed using a checklist-based pre-assessment approach. As a result of this evaluation, 121 requirements were classified as "yes", 4 requirements as "no" and 29 requirements as "not suitable/incomplete". In the second step, detailed risk analysis was carried out with the FMEA (Failure Modes and Effects Analysis) method only for 33 requirements determined as "no" and "not suitable/missing".Thanks to the proposed two-step approach, the risk assessment process was completed with approximately 79% fewer analysis steps compared to the detailed analysis of all requirements. This method reduces time and labor loss, allowing risks to be managed more effectively and preventive measures to be developed faster. Keywords: Occupational Health and Safety, Risk Assessment, Shopping Malls, Checklist, FMEA

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-05-31
DOI
https://doi.org/10.5281/zenodo.20478929
Primary Topic
Facilities and Workplace Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A Comprehensive Risk Assessment Method For Shopping Malls

Sezgin Aygün, Ufuk GÜLER
Zenodo (CERN European Organization for Nuclear Research)
Facilities and Workplace Management
article

A Comprehensive Risk Assessment Method For Shopping Malls

Sezgin Aygün, Ufuk GÜLER
article en

Abstract

Shopping malls are structures that pose multidimensional risks in terms of occupational health and safety due to the high density of visitors and the simultaneous execution of many different activities. In this study, a two-step, integrated risk assessment method was developed for shopping malls and applied in a shopping mall located within the borders of Istanbul, serving approximately 50,000 visitors daily. In the first step of the proposed method, a total of 153 requirements were analyzed using a checklist-based pre-assessment approach. As a result of this evaluation, 121 requirements were classified as "yes", 4 requirements as "no" and 29 requirements as "not suitable/incomplete". In the second step, detailed risk analysis was carried out with the FMEA (Failure Modes and Effects Analysis) method only for 33 requirements determined as "no" and "not suitable/missing".Thanks to the proposed two-step approach, the risk assessment process was completed with approximately 79% fewer analysis steps compared to the detailed analysis of all requirements. This method reduces time and labor loss, allowing risks to be managed more effectively and preventive measures to be developed faster. Keywords: Occupational Health and Safety, Risk Assessment, Shopping Malls, Checklist, FMEA

Zenodo (CERN European Organization for Nuclear Research)
Decent work and economic growth
Openalex Percentile: Top 4%
Facilities and Workplace Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.