A Highly Parallel Integrated Process of Unloading, Exchanging, and Collecting for Rail-Changing
Heavy-haul railways require efficient rail replacement because extreme axle loads and high-density transport accelerate rail wear. Traditional manual-led processes are limited by fragmented operations, high labor demand, and complex equipment scheduling, typically completing about 1 km of rail replacement within a 4 h maintenance window and requiring approximately 340 workers. This study is positioned as construction-process modeling, workflow organization, and simulation-supported feasibility analysis for an integrated rail-changing workflow, rather than the development or field validation of a fully mature rail-changing machine. The proposed workflow coordinates rail unloading, on-board welding, fastener disassembly, rail cutting, exchange-recovery, fastening, closure welding, and final inspection through a highly parallel construction organization. A process-level train-set configuration, including a tractor, a long-rail comprehensive transport vehicle, an exchange-recovery integrated transport vehicle, and a mobile welding vehicle, is used as an engineering carrier to support the closed-loop workflow of unloading, welding, exchange, and recovery. Based on engineering time-study analysis, field experience, expert consultation, and discrete-event simulation, the results indicate that the proposed workflow has the potential to complete a simulated 2 km rail-changing task within a single 4 h maintenance window with an estimated labor demand of 80–95 personnel under the specified assumptions. The study provides conceptual and simulation-supported feasibility evidence for construction-process organization, rather than field-validated machine performance, and offers a technical reference for improving the mechanization and coordination of heavy-haul railway maintenance.
Authors
- C J Li
- Qi Huang
- Hui Li (ORCID: https://orcid.org/0000-0001-9198-3951)
- Zi Wang (ORCID: https://orcid.org/0000-0002-3953-0493)
- Youshui Lu
- Yansong Shi (ORCID: https://orcid.org/0009-0003-4771-7957)
- Liqiang Fu
Institutions
- China Railway Group (China) (CN)
- Xi'an Jiaotong University (CN)
Publication Details
- Journal
- Vehicles
- Published
- 2026-05-29
- DOI
- https://doi.org/10.3390/vehicles8060117
- Primary Topic
- Railway Engineering and Dynamics
- Type
- article
- Field-Weighted Citation Impact
- 0.00