The Vertical Shaft Machine (VSM) method is increasingly used in ultra-deep prefabricated shafts. However, as its application extends into hard ground, existing segment designs still largely follow soft soil experiences, resulting in insufficient material utilization and poor economic efficiency. Based on the first VSM shaft in South China, this study establishes a refined finite element model validated by field monitoring and subsequently constructs a structural response database. A GA-XGBoost surrogate model combined with the SHAP method quantifies the contributions of key parameters—concrete strength, rebar diameter, and steel plate thickness—to shaft structural stress. Following the optimization objective of reducing material consumption while maintaining the overall structural performance of the original design, an optimization scheme for Ring 0 reinforcement is proposed. Results show that SHAP analysis effectively identifies the contribution ranking of each parameter to the structural response: for Ring 0, concrete strength contributes the most while rebar diameter shows low sensitivity; for the cutting edge ring, steel plate thickness and concrete strength contribute significantly, whereas tie bars show the lowest sensitivity. After optimization of Ring 0, reinforcement consumption per linear meter of segment is reduced by 43.43 kg, and steel content decreases by 57.91 kg/m3. Verification confirms that the stress distribution remains largely unchanged and crack width meets specification limits. Tie bars in the cutting edge ring play an irreplaceable structural role during concrete pouring and should not be directly optimized. The proposed scheme reduces material consumption while ensuring structural safety, offering a reference for optimizing VSM shaft segment structures in hard ground conditions.

Authors

Institutions

Publication Details

Journal
Buildings
Published
2026-05-29
DOI
https://doi.org/10.3390/buildings16112187
Primary Topic
Tunneling and Rock Mechanics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimization of VSM Shaft Segment Structural Parameters Based on SHAP Analysis: A Case Study on Guangzhou–Huadu Intercity No. 2 Shield Shaft Project

Xinjun Cheng, Jianxiong Zhao, X G Li, Tao Liu et al.
Buildings
Tunneling and Rock Mechanics
article

Optimization of VSM Shaft Segment Structural Parameters Based on SHAP Analysis: A Case Study on Guangzhou–Huadu Intercity No. 2 Shield Shaft Project

Xinjun Cheng, Jianxiong Zhao, X G Li, Tao Liu, Junyi Zhang, Zhicheng Liu, Jie Yuan
article en

Abstract

The Vertical Shaft Machine (VSM) method is increasingly used in ultra-deep prefabricated shafts. However, as its application extends into hard ground, existing segment designs still largely follow soft soil experiences, resulting in insufficient material utilization and poor economic efficiency. Based on the first VSM shaft in South China, this study establishes a refined finite element model validated by field monitoring and subsequently constructs a structural response database. A GA-XGBoost surrogate model combined with the SHAP method quantifies the contributions of key parameters—concrete strength, rebar diameter, and steel plate thickness—to shaft structural stress. Following the optimization objective of reducing material consumption while maintaining the overall structural performance of the original design, an optimization scheme for Ring 0 reinforcement is proposed. Results show that SHAP analysis effectively identifies the contribution ranking of each parameter to the structural response: for Ring 0, concrete strength contributes the most while rebar diameter shows low sensitivity; for the cutting edge ring, steel plate thickness and concrete strength contribute significantly, whereas tie bars show the lowest sensitivity. After optimization of Ring 0, reinforcement consumption per linear meter of segment is reduced by 43.43 kg, and steel content decreases by 57.91 kg/m3. Verification confirms that the stress distribution remains largely unchanged and crack width meets specification limits. Tie bars in the cutting edge ring play an irreplaceable structural role during concrete pouring and should not be directly optimized. The proposed scheme reduces material consumption while ensuring structural safety, offering a reference for optimizing VSM shaft segment structures in hard ground conditions.

BuildingsVol. 16(11)
Guangzhou University (CN), Guangdong University of Petrochemical Technology (CN), China Railway Construction Corporation (China) (CN), China Railway Group (China) (CN), Guangzhou Metro Group (China) (CN)
Openalex Percentile: Top 9%
Tunneling and Rock Mechanics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.