Solution of a bilevel optimistic scheduling problem on parallel machines

Abstract We consider the uniform parallel machines scheduling problem in the context of optimistic bilevel optimization, where two speed options are considered. In this scenario, the leader selects and assigns a subset of jobs to the follower to minimize the weighted number of tardy jobs, while the follower schedules these jobs on a set of uniform machines to minimize the total completion time. This problem has practical applications in Industry 4.0. We show that this problem is $$\mathcal NP$$ <mml:math xmlns:mml="http://www.w3.org/1998/Math/MathML"> <mml:mrow> <mml:mi>N</mml:mi> <mml:mi>P</mml:mi> </mml:mrow> </mml:math> -hard in the strong sense by providing a reduction from the Numerical 3-Dimensional Matching problem and we provide a moderately exponential-time dynamic programming algorithm. The problem is solved by means of a concise MIP formulation and a branch-and-bound algorithm that embeds a column generation approach for the lower bound computation. Computational experiments are presented for instances with up to 100 jobs and 4 machines while larger problems are out of reach for the proposed approaches.

Authors

Institutions

Publication Details

Journal
Annals of Operations Research
Published
2026-05-29
DOI
https://doi.org/10.1007/s10479-026-07281-z
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Solution of a bilevel optimistic scheduling problem on parallel machines

Vincent t'Kindt, Quentin Schau, Jippe Hoogeveen, Federico Della Croce et al.
Annals of Operations Research
Scheduling and Optimization Algorithms
article

Solution of a bilevel optimistic scheduling problem on parallel machines

Vincent t'Kindt, Quentin Schau, Jippe Hoogeveen, Federico Della Croce, Han Hoogeveen, Olivier Ploton
article en

Abstract

Abstract We consider the uniform parallel machines scheduling problem in the context of optimistic bilevel optimization, where two speed options are considered. In this scenario, the leader selects and assigns a subset of jobs to the follower to minimize the weighted number of tardy jobs, while the follower schedules these jobs on a set of uniform machines to minimize the total completion time. This problem has practical applications in Industry 4.0. We show that this problem is $$\mathcal NP$$ <mml:math xmlns:mml="http://www.w3.org/1998/Math/MathML"> <mml:mrow> <mml:mi>N</mml:mi> <mml:mi>P</mml:mi> </mml:mrow> </mml:math> -hard in the strong sense by providing a reduction from the Numerical 3-Dimensional Matching problem and we provide a moderately exponential-time dynamic programming algorithm. The problem is solved by means of a concise MIP formulation and a branch-and-bound algorithm that embeds a column generation approach for the lower bound computation. Computational experiments are presented for instances with up to 100 jobs and 4 machines while larger problems are out of reach for the proposed approaches.

Annals of Operations Research
Politecnico di Torino (IT), Utrecht University (NL), Laboratoire d'Informatique Fondamentale et Appliquée de Tours (FR)
Politecnico di Torino
Industry, innovation and infrastructure
Openalex Percentile: Top 6%
Scheduling and Optimization Algorithms
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.