Optimization of transmission maintenance schedule using transformer load forecasting with modified hybrid CNN-LSTM and integer linear programming

Abstract Transformers are important parts for maintaining the reliability of electrical power systems. However, their maintenance requires power outages, which impact electricity sales. The maintenance is carried out based on operator readiness and does not take load conditions into account. The purpose of this study is to obtain an optimal transformer maintenance schedule based on load forecasting results. The forecasting method used a modified hybrid Convolutional Neural Network and Long Short-Term Memory (CNN-LSTM) for a one-day forecast. The modification was made to optimize the model in capturing the temporal and nonlinear characteristics of the load. The factors used were load, current, reactive power, temperature, tap position, and time features. The use of current factors that were highly correlated with load, combined with time features, could improve forecasting accuracy. Therefore, it was chosen as the proposed model. Then, the performance results were compared with the existing model, showing a root mean squared error (RMSE) value of 2.03 (an improvement of 4.69%), a mean absolute error (MAE) of 1.58 (an improvement of 7.06%), and a mean absolute percentage error (MAPE) of 13.6 (an improvement of 7.92%) for 24-h predictions. The forecasting results were integrated with an integer linear programming (ILP) model to determine the maintenance schedule with a load minimization objective function. Maintenance was limited to 8:00 to 5:00 for 4 h. The results showed that maintenance at minimum load could provide energy efficiency of 3.8% compared to existing conditions. Further research could test the model on extended data and explore other parameters.

Authors

Institutions

Publication Details

Journal
Journal of Electrical Systems and Information Technology
Published
2026-05-27
DOI
https://doi.org/10.1186/s43067-026-00360-y
Primary Topic
Energy Load and Power Forecasting
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimization of transmission maintenance schedule using transformer load forecasting with modified hybrid CNN-LSTM and integer linear programming

Suharjito, I Wayan Vito Bratanata Meranggi
Journal of Electrical Systems and Information Technology
Energy Load and Power Forecasting
article

Optimization of transmission maintenance schedule using transformer load forecasting with modified hybrid CNN-LSTM and integer linear programming

Suharjito, I Wayan Vito Bratanata Meranggi
article en

Abstract

Abstract Transformers are important parts for maintaining the reliability of electrical power systems. However, their maintenance requires power outages, which impact electricity sales. The maintenance is carried out based on operator readiness and does not take load conditions into account. The purpose of this study is to obtain an optimal transformer maintenance schedule based on load forecasting results. The forecasting method used a modified hybrid Convolutional Neural Network and Long Short-Term Memory (CNN-LSTM) for a one-day forecast. The modification was made to optimize the model in capturing the temporal and nonlinear characteristics of the load. The factors used were load, current, reactive power, temperature, tap position, and time features. The use of current factors that were highly correlated with load, combined with time features, could improve forecasting accuracy. Therefore, it was chosen as the proposed model. Then, the performance results were compared with the existing model, showing a root mean squared error (RMSE) value of 2.03 (an improvement of 4.69%), a mean absolute error (MAE) of 1.58 (an improvement of 7.06%), and a mean absolute percentage error (MAPE) of 13.6 (an improvement of 7.92%) for 24-h predictions. The forecasting results were integrated with an integer linear programming (ILP) model to determine the maintenance schedule with a load minimization objective function. Maintenance was limited to 8:00 to 5:00 for 4 h. The results showed that maintenance at minimum load could provide energy efficiency of 3.8% compared to existing conditions. Further research could test the model on extended data and explore other parameters.

Journal of Electrical Systems and Information TechnologyVol. 13(1)
Binus University (ID)
Affordable and clean energy
Openalex Percentile: Top 9%
Energy Load and Power Forecasting
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Optimization of transmission maintenance schedule using transformer load forecasting with modified hybrid CNN-LSTM and integer linear programming — Suharjito, I Wayan Vito Bratanata Meranggi · Journal of Electrical Systems and Information Technology (2026) | TGRS Research Map | TGRS