Optimizing well completion for maximized oil recovery in offshore horizontal wells: insights from simulation-based analysis

Well completion design is considered one of the most influential factors controlling well productivity, especially in horizontal wells, where the formation damage potential and operational constraints is higher compared to the vertical well. The integrated flow simulation-based evaluation of completion type, perforation design, and completion-string geometry that quantitatively provides guidelines to optimize well performance has been less attended. In this research three horizontal wells situated in an offshore oil field are investigated to complete in various manner towards production optimization approach. Numerical reservoir and wellbore simulations were conducted at different wellhead pressures. According to this, a sensitivity analysis was conducted for the perforation parameters (perforation density, length, and diameter) and the completion string (internal diameter and length). Simulation results indicate that open-hole completion gives considerably higher production rate compared with cased-hole completion (increase of 96.8, 94.0, and 126.8 BPD for three wells). Under conditions of appropriate shut per foot perforation obtained from petrophysical properties, flow simulation showed that perforation density of 8 SPF along with maximum length and diameter of perforation yields the maximum rates. Sensitivity analysis reveals that an increase in internal diameter of the completion string improves production, while an increase in the length of tubing increases the wellbore pressure losses resulting in reduced productivity. For instance, increasing the length of tubing by 400 feet resulted in a drop in production by 0.04%, 0.13%, and 0.11% for three wells.

Authors

Institutions

Publication Details

Journal
Journal of Petroleum Exploration and Production Technology
Published
2026-05-27
DOI
https://doi.org/10.1007/s13202-026-02155-3
Primary Topic
Hydraulic Fracturing and Reservoir Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimizing well completion for maximized oil recovery in offshore horizontal wells: insights from simulation-based analysis

Maysam Mohammadzadeh-Shirazi, Mohammad Jahanbanian
Journal of Petroleum Exploration and Production Technology
Hydraulic Fracturing and Reservoir Analysis
article

Optimizing well completion for maximized oil recovery in offshore horizontal wells: insights from simulation-based analysis

Maysam Mohammadzadeh-Shirazi, Mohammad Jahanbanian
article en

Abstract

Well completion design is considered one of the most influential factors controlling well productivity, especially in horizontal wells, where the formation damage potential and operational constraints is higher compared to the vertical well. The integrated flow simulation-based evaluation of completion type, perforation design, and completion-string geometry that quantitatively provides guidelines to optimize well performance has been less attended. In this research three horizontal wells situated in an offshore oil field are investigated to complete in various manner towards production optimization approach. Numerical reservoir and wellbore simulations were conducted at different wellhead pressures. According to this, a sensitivity analysis was conducted for the perforation parameters (perforation density, length, and diameter) and the completion string (internal diameter and length). Simulation results indicate that open-hole completion gives considerably higher production rate compared with cased-hole completion (increase of 96.8, 94.0, and 126.8 BPD for three wells). Under conditions of appropriate shut per foot perforation obtained from petrophysical properties, flow simulation showed that perforation density of 8 SPF along with maximum length and diameter of perforation yields the maximum rates. Sensitivity analysis reveals that an increase in internal diameter of the completion string improves production, while an increase in the length of tubing increases the wellbore pressure losses resulting in reduced productivity. For instance, increasing the length of tubing by 400 feet resulted in a drop in production by 0.04%, 0.13%, and 0.11% for three wells.

Journal of Petroleum Exploration and Production Technology
Shiraz University (IR)
Openalex Percentile: Top 10%
Hydraulic Fracturing and Reservoir Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.