Simulation‐Based Evaluation of Dismantling Variants for Concrete Modules from a Production Logistics Perspective

Designing and manufacturing high‐performance concrete buildings can lead to cost‐effective and rapid construction. The project's main goal was to develop simulation‐based methods to optimize the planning of precast concrete production from design to production. This involved evaluating strategies for decomposing building structures into individual modules and optimising production sequences. The research aimed to enhance precast concrete production planning systematically, develop a cost model for precast concrete production systems, and enable the automatic generation of simulation models for precast concrete production systems. Key achievements include an ontology for precast concrete production; a simulation framework integrating the semantic Digital Twin concept of the Asset Administration Shell (AAS); and a scheduling method for modern precast concrete production systems incorporating circulation systems. The project has also released several software tools and research papers that provide a foundation for future research at the intersection of construction informatics and manufacturing engineering.

Authors

Institutions

Publication Details

Journal
Beton- und Stahlbetonbau
Published
2026-05-27
DOI
https://doi.org/10.1002/best.70133
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Simulation‐Based Evaluation of Dismantling Variants for Concrete Modules from a Production Logistics Perspective

Vincent Betker, Thorsten Schmidt, Mathias Kühn
Beton- und Stahlbetonbau
BIM and Construction Integration
article

Simulation‐Based Evaluation of Dismantling Variants for Concrete Modules from a Production Logistics Perspective

Vincent Betker, Thorsten Schmidt, Mathias Kühn
article en

Abstract

Designing and manufacturing high‐performance concrete buildings can lead to cost‐effective and rapid construction. The project's main goal was to develop simulation‐based methods to optimize the planning of precast concrete production from design to production. This involved evaluating strategies for decomposing building structures into individual modules and optimising production sequences. The research aimed to enhance precast concrete production planning systematically, develop a cost model for precast concrete production systems, and enable the automatic generation of simulation models for precast concrete production systems. Key achievements include an ontology for precast concrete production; a simulation framework integrating the semantic Digital Twin concept of the Asset Administration Shell (AAS); and a scheduling method for modern precast concrete production systems incorporating circulation systems. The project has also released several software tools and research papers that provide a foundation for future research at the intersection of construction informatics and manufacturing engineering.

Beton- und Stahlbetonbau
Hochschule für Technik und Wirtschaft Dresden – University of Applied Sciences (DE), Technische Universität Dresden (DE)
Deutsche Forschungsgemeinschaft
Openalex Percentile: Top 8%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Simulation‐Based Evaluation of Dismantling Variants for Concrete Modules from a Production Logistics Perspective — Vincent Betker, Thorsten Schmidt, et al. · Beton- und Stahlbetonbau (2026) | TGRS Research Map | TGRS