The replacement of Barmouth viaduct metallics: from concept to construction

Barmouth viaduct metallic spans required replacement after over 100 years in the marine estuary environment in north-west Wales. In 2020, Network Rail instigated a tender process to choose a design and build team to replace the metallic trusses. The five trusses to be replaced, located on the environmentally sensitive coastline, at the end of the longest timber railway viaduct still in operation in the UK, required a highly technical and innovative construction method as traditional techniques using jack-up barges and cranes introduced additional risk to the project. This paper describes the development of the concept, the design of the new permanent trusses, the temporary works to install the new bridge and the construction period. The previous structure was Grade II* listed and the new structure replicates it while staying true to modern fabrication methods and retains the original abutment and caisson substructure. The new trusses were transported carefully along the timber viaduct to the south and were used in the temporary case to support the old structure as it was demolished and lowered to pontoons below. The whole construction was successfully carried out to programme within a tight 3-month track blockade in the autumn of 2023.

Authors

Institutions

Publication Details

Journal
Proceedings of the Institution of Civil Engineers - Civil Engineering
Published
2026-05-23
DOI
https://doi.org/10.1680/jcien.25.00461
Primary Topic
Civil and Structural Engineering Research
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

The replacement of Barmouth viaduct metallics: from concept to construction

Mark Scrivener, Thomas Ashworth, Jim Tod, Rebekah Cheah et al.
Proceedings of the Institution of Civil Engineers - Civil Engineering
Civil and Structural Engineering Research
article

The replacement of Barmouth viaduct metallics: from concept to construction

Mark Scrivener, Thomas Ashworth, Jim Tod, Rebekah Cheah, Steve Richardson, Douglas Blogg
article en

Abstract

Barmouth viaduct metallic spans required replacement after over 100 years in the marine estuary environment in north-west Wales. In 2020, Network Rail instigated a tender process to choose a design and build team to replace the metallic trusses. The five trusses to be replaced, located on the environmentally sensitive coastline, at the end of the longest timber railway viaduct still in operation in the UK, required a highly technical and innovative construction method as traditional techniques using jack-up barges and cranes introduced additional risk to the project. This paper describes the development of the concept, the design of the new permanent trusses, the temporary works to install the new bridge and the construction period. The previous structure was Grade II* listed and the new structure replicates it while staying true to modern fabrication methods and retains the original abutment and caisson substructure. The new trusses were transported carefully along the timber viaduct to the south and were used in the temporary case to support the old structure as it was demolished and lowered to pontoons below. The whole construction was successfully carried out to programme within a tight 3-month track blockade in the autumn of 2023.

Proceedings of the Institution of Civil Engineers - Civil Engineering
Consolidated Contractors Company (Greece) (GR), Tony Gee and Partners (GB)
Life below water
Openalex Percentile: Top 8%
Civil and Structural Engineering Research
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

The replacement of Barmouth viaduct metallics: from concept to construction — Mark Scrivener, Thomas Ashworth, et al. · Proceedings of the Institution of Civil Engineers - Civil Engineering (2026) | TGRS Research Map | TGRS