Sea‐Horse Optimizer‐Based Selective Maintenance for Phased Mission Systems Under Different Shift Schedules With Multiple Maintenance Workers

ABSTRACT Phased mission systems (PMSs) are systems composed of several different subsystems used to perform a series of consecutive missions. PMS has a high demand for mission success probability and selective maintenance action optimization is the key to ensure the safe and reliable operation of PMS, therefore it is necessary to define a reasonable selective maintenance action for PMS. This paper proposes a PMS mission success probability evaluation method based on imperfect maintenance, and constructs a selective maintenance action optimization model for PMS under the constraints of maintenance cost, maintenance time and maintenance workers. Based on the optimization model, a selective maintenance action solving method based on sea‐horse optimizer (SHO) is designed. Compared with the genetic algorithm (GA), the performance of SHO is verified from the aspects of mission success probability, running time, convergence. Experimental results show that the SHO can effectively analyze the optimal mission interval to determine the optimal production organization form.

Authors

Institutions

Publication Details

Journal
Quality and Reliability Engineering International
Published
2026-05-22
DOI
https://doi.org/10.1002/qre.70264
Primary Topic
Reliability and Maintenance Optimization
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Sea‐Horse Optimizer‐Based Selective Maintenance for Phased Mission Systems Under Different Shift Schedules With Multiple Maintenance Workers

Zaoyan Zhang, Zhenggeng Ye, Zhiqiang Cai, Jiangbin Zhao et al.
Quality and Reliability Engineering International
Reliability and Maintenance Optimization
article

Sea‐Horse Optimizer‐Based Selective Maintenance for Phased Mission Systems Under Different Shift Schedules With Multiple Maintenance Workers

Zaoyan Zhang, Zhenggeng Ye, Zhiqiang Cai, Jiangbin Zhao, Huiqi Du
article en

Abstract

ABSTRACT Phased mission systems (PMSs) are systems composed of several different subsystems used to perform a series of consecutive missions. PMS has a high demand for mission success probability and selective maintenance action optimization is the key to ensure the safe and reliable operation of PMS, therefore it is necessary to define a reasonable selective maintenance action for PMS. This paper proposes a PMS mission success probability evaluation method based on imperfect maintenance, and constructs a selective maintenance action optimization model for PMS under the constraints of maintenance cost, maintenance time and maintenance workers. Based on the optimization model, a selective maintenance action solving method based on sea‐horse optimizer (SHO) is designed. Compared with the genetic algorithm (GA), the performance of SHO is verified from the aspects of mission success probability, running time, convergence. Experimental results show that the SHO can effectively analyze the optimal mission interval to determine the optimal production organization form.

Quality and Reliability Engineering International
Xi'an University of Science and Technology (CN), Northwestern Polytechnical University (CN), Zhengzhou University (CN), Xi'an University of Technology (CN)
National Natural Science Foundation of China
Life below water
Openalex Percentile: Top 6%
Reliability and Maintenance Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.