AI-Driven Optimization of Scheduling, Risk, and Sustainability in BIM-Enabled Construction Project Management

Abstract The construction industry faces escalating challenges in managing project schedules, mitigating risks, and achieving environmental sustainability, particularly in developing-country contexts where digital infrastructure, professional capacity, and building information modeling (BIM) regulatory frameworks remain limited. This study presents an integrated framework combining artificial intelligence (AI) with building information modeling (BIM) to optimize scheduling, risk assessment, and sustainability performance, validated across three real-world construction projects of varying scales located in Palestine: a high-rise residential tower, a mid-rise mixed-use building, and a smaller-scale mixed-use building. Structured quantitative datasets were extracted from BIM models developed using Autodesk Revit, Navisworks, and Primavera P6, and subsequently analyzed using machine learning (ML) algorithms, including Random Forest (RF) and XGBoost, alongside genetic algorithm (GA)-based material optimization. Baseline performance was established through conventional methods, namely the Critical Path Method (CPM), Program Evaluation and Review Technique (PERT), and Monte Carlo simulation, enabling systematic comparison against AI-based outputs. The results demonstrated measurable improvements across all three performance dimensions: Project durations were reduced by up to 3.52%, risk classification accuracy exceeded 99.7%, embodied carbon was reduced by 67%, and energy consumption decreased by 70% relative to conventional approaches. Feature importance analysis using Shapley Additive Explanations (SHAP) further enhanced the interpretability and transparency of AI-driven predictions, supporting practical adoption by construction project managers. The findings confirm that the proposed AI–BIM integration framework enables reliable, data-driven decision-making, demonstrates transferability across diverse geographical and resource-constrained contexts, and contributes to digital transformation and global carbon reduction objectives within the Construction 4.0 paradigm.

Authors

Institutions

Publication Details

Journal
Arabian Journal for Science and Engineering
Published
2026-05-21
DOI
https://doi.org/10.1007/s13369-026-11351-6
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

AI-Driven Optimization of Scheduling, Risk, and Sustainability in BIM-Enabled Construction Project Management

Sepanta Naimi, Suhib O. A. Amro, Abdullahi Abdu Ibrahim
Arabian Journal for Science and Engineering
BIM and Construction Integration
article

AI-Driven Optimization of Scheduling, Risk, and Sustainability in BIM-Enabled Construction Project Management

Sepanta Naimi, Suhib O. A. Amro, Abdullahi Abdu Ibrahim
article en

Abstract

Abstract The construction industry faces escalating challenges in managing project schedules, mitigating risks, and achieving environmental sustainability, particularly in developing-country contexts where digital infrastructure, professional capacity, and building information modeling (BIM) regulatory frameworks remain limited. This study presents an integrated framework combining artificial intelligence (AI) with building information modeling (BIM) to optimize scheduling, risk assessment, and sustainability performance, validated across three real-world construction projects of varying scales located in Palestine: a high-rise residential tower, a mid-rise mixed-use building, and a smaller-scale mixed-use building. Structured quantitative datasets were extracted from BIM models developed using Autodesk Revit, Navisworks, and Primavera P6, and subsequently analyzed using machine learning (ML) algorithms, including Random Forest (RF) and XGBoost, alongside genetic algorithm (GA)-based material optimization. Baseline performance was established through conventional methods, namely the Critical Path Method (CPM), Program Evaluation and Review Technique (PERT), and Monte Carlo simulation, enabling systematic comparison against AI-based outputs. The results demonstrated measurable improvements across all three performance dimensions: Project durations were reduced by up to 3.52%, risk classification accuracy exceeded 99.7%, embodied carbon was reduced by 67%, and energy consumption decreased by 70% relative to conventional approaches. Feature importance analysis using Shapley Additive Explanations (SHAP) further enhanced the interpretability and transparency of AI-driven predictions, supporting practical adoption by construction project managers. The findings confirm that the proposed AI–BIM integration framework enables reliable, data-driven decision-making, demonstrates transferability across diverse geographical and resource-constrained contexts, and contributes to digital transformation and global carbon reduction objectives within the Construction 4.0 paradigm.

Arabian Journal for Science and Engineering
Altınbaş University (TR)
Industry, innovation and infrastructure
Openalex Percentile: Top 8%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.