Model for continuous cut-off grade estimation with system dynamic simulation
Abstract This paper addresses the optimisation of cut-off grade (COG) policies in mineral mining to maximise economic returns over a defined planning horizon. Traditionally, practical planning horizons have spanned months or years due to the inherent computational complexity of the problem. This study contributes a continuous, simulation-based System Dynamics (SD) solution to the COG-estimation problem. Compared to existing numerical Real Option (RO) methodologies, the proposed SD approach is more intuitive and accessible for industry practitioners. The model is tested and followed by a discussion on its practical application by mine planning engineers as a viable alternative to highly complex mathematical RO frameworks. The results demonstrate that this method adds significant value to mining valuation practices by enabling a responsive tracking of optimal COG more precisely than is possible through discrete, periodic revisions.
Authors
- Ramin Rakhsha
- Jyrki Savolainen (ORCID: https://orcid.org/0000-0001-9721-642X)
- Mark Reynolds
Institutions
- The University of Western Australia (AU)
- Lappeenranta-Lahti University of Technology (FI)
Publication Details
- Journal
- Mineral Economics
- Published
- 2026-05-21
- DOI
- https://doi.org/10.1007/s13563-026-00650-x
- Primary Topic
- Capital Investment and Risk Analysis
- Type
- article
- Field-Weighted Citation Impact
- 0.00
Funders
- University of Western Australia
- Strategic Research Council