Assessing Key Delay Causes in Residential Investment Projects Using Fuzzy AHP and Risk Matrix

<ns3:p>Background Residential investment projects play a vital economic and social role in Iraq; however, delays are a persistent problem that negatively affects project performance. Identifying and prioritizing the main causes of delay is challenging due to uncertainty and differences in expert judgment. Therefore, a systematic quantitative approach is required to evaluate these causes and their associated risks. Methods This study aimed to identify, classify, and prioritize the causes of delay in residential investment projects in Iraq. A questionnaire survey was conducted with experts specializing in residential projects. Fifteen main delay causes were identified and grouped into three categories: general causes, project parties–related causes, and resource-related causes. The Fuzzy Analytic Hierarchy Process was applied to determine the relative importance weights of the delay causes under uncertainty. The degree of delay risk for each cause was calculated by combining its relative weight with the probability of occurrence and impact. Results The results indicated that, within the general causes category, management-related and political causes were the most significant, each accounting for 14.6%. In the project parties–related category, owner-related causes had the highest importance, with a relative weight of 50.6%. For the resource-related category, labor-related causes were found to be the most influential, with a relative importance of 61.2%. The risk assessment highlighted variations in delay severity depending on both uncertainty and impact levels. Conclusions The findings demonstrate the effectiveness of the Fuzzy Analytic Hierarchy Process in prioritizing delay causes under uncertainty in residential investment projects. The proposed framework supports decision-makers in identifying critical delay factors, improving risk management, and reducing delays in future residential projects in Iraq.</ns3:p>

Institutions

Publication Details

Journal
F1000Research
Published
2026-05-19
DOI
https://doi.org/10.12688/f1000research.176072.2
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Assessing Key Delay Causes in Residential Investment Projects Using Fuzzy AHP and Risk Matrix

F1000Research
Construction Project Management and Performance
article

Assessing Key Delay Causes in Residential Investment Projects Using Fuzzy AHP and Risk Matrix

article en

Abstract

<ns3:p>Background Residential investment projects play a vital economic and social role in Iraq; however, delays are a persistent problem that negatively affects project performance. Identifying and prioritizing the main causes of delay is challenging due to uncertainty and differences in expert judgment. Therefore, a systematic quantitative approach is required to evaluate these causes and their associated risks. Methods This study aimed to identify, classify, and prioritize the causes of delay in residential investment projects in Iraq. A questionnaire survey was conducted with experts specializing in residential projects. Fifteen main delay causes were identified and grouped into three categories: general causes, project parties–related causes, and resource-related causes. The Fuzzy Analytic Hierarchy Process was applied to determine the relative importance weights of the delay causes under uncertainty. The degree of delay risk for each cause was calculated by combining its relative weight with the probability of occurrence and impact. Results The results indicated that, within the general causes category, management-related and political causes were the most significant, each accounting for 14.6%. In the project parties–related category, owner-related causes had the highest importance, with a relative weight of 50.6%. For the resource-related category, labor-related causes were found to be the most influential, with a relative importance of 61.2%. The risk assessment highlighted variations in delay severity depending on both uncertainty and impact levels. Conclusions The findings demonstrate the effectiveness of the Fuzzy Analytic Hierarchy Process in prioritizing delay causes under uncertainty in residential investment projects. The proposed framework supports decision-makers in identifying critical delay factors, improving risk management, and reducing delays in future residential projects in Iraq.</ns3:p>

F1000ResearchVol. 15
University of Baghdad (IQ)
Decent work and economic growth
Openalex Percentile: Top 3%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.