Problem Floors and State Memory for Flexible Job Shop Scheduling

Problem Floors and State Memory for Flexible Job Shop Scheduling A Lightweight Solver for the FJSSP-W Problem We present a lightweight, memory-guided solver for the Flexible Job Shop Scheduling Problem with Worker Flexibility (FJSSP-W). The method decomposes FJSSP-W into two sub-problems: a Hamiltonian Path on the job interleaving graph for sequence optimisation, and a congestion-aware greedy assignment for machine and worker allocation. A state memory structure records every explored configuration to prevent repeated evaluation of failed states. A floor detector terminates the search at the structural problem floor — the point where the remaining gap is entangled with satisfied constraints. Across 30 benchmark instances from the IEEE WCCI 2026 FJSSP-W competition, the solver converges in 43–159 evaluations (mean 91), reducing makespan over greedy baselines in every instance. Results are cross-validated on two independent machines (Raspberry Pi 4 and Apple M4) across 10 deterministic seeds (300 total runs). The central finding: the Spearman rank correlation between makespan and gap percentage is ρₛ = −0.21 — near zero. The gap is driven by structural entanglement, not instance size. The floor is where the problem stops, not where the solver gives up. The competition allocates 5,000,000 evaluations per run. This solver uses 0.002% of that budget. Five million evaluations is not a budget. It is an apology for not knowing where the floor is. Keywords 1. Flexible Job Shop Scheduling 2. Wavelength Convergence 3. Frequency Decomposition 4. Hamiltonian Path 5. Problem Floors 6. Ouroboros Engine 7. FJSSP-W 8. Meta-heuristic 9. Combinatorial Optimization 10. IEEE WCCI 2026 Companion: On Problem Floors (DOI: 10.5281/zenodo.20113182) License: CC BY 4.0

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-05-17
DOI
https://doi.org/10.5281/zenodo.20248425
Primary Topic
Scheduling and Optimization Algorithms
Type
preprint
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
preprint

Problem Floors and State Memory for Flexible Job Shop Scheduling

Mark Roy Godfrey
Zenodo (CERN European Organization for Nuclear Research)
Scheduling and Optimization Algorithms
preprint

Problem Floors and State Memory for Flexible Job Shop Scheduling

Mark Roy Godfrey
preprint en

Abstract

Problem Floors and State Memory for Flexible Job Shop Scheduling A Lightweight Solver for the FJSSP-W Problem We present a lightweight, memory-guided solver for the Flexible Job Shop Scheduling Problem with Worker Flexibility (FJSSP-W). The method decomposes FJSSP-W into two sub-problems: a Hamiltonian Path on the job interleaving graph for sequence optimisation, and a congestion-aware greedy assignment for machine and worker allocation. A state memory structure records every explored configuration to prevent repeated evaluation of failed states. A floor detector terminates the search at the structural problem floor — the point where the remaining gap is entangled with satisfied constraints. Across 30 benchmark instances from the IEEE WCCI 2026 FJSSP-W competition, the solver converges in 43–159 evaluations (mean 91), reducing makespan over greedy baselines in every instance. Results are cross-validated on two independent machines (Raspberry Pi 4 and Apple M4) across 10 deterministic seeds (300 total runs). The central finding: the Spearman rank correlation between makespan and gap percentage is ρₛ = −0.21 — near zero. The gap is driven by structural entanglement, not instance size. The floor is where the problem stops, not where the solver gives up. The competition allocates 5,000,000 evaluations per run. This solver uses 0.002% of that budget. Five million evaluations is not a budget. It is an apology for not knowing where the floor is. Keywords 1. Flexible Job Shop Scheduling 2. Wavelength Convergence 3. Frequency Decomposition 4. Hamiltonian Path 5. Problem Floors 6. Ouroboros Engine 7. FJSSP-W 8. Meta-heuristic 9. Combinatorial Optimization 10. IEEE WCCI 2026 Companion: On Problem Floors (DOI: 10.5281/zenodo.20113182) License: CC BY 4.0

Zenodo (CERN European Organization for Nuclear Research)
Decent work and economic growth
Scheduling and Optimization Algorithms
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.