Multi-objective scheduling optimization for linear megaprojects considering technological innovation

Technological innovation plays a critical role in driving the progress of linear megaprojects, despite being characterized by uncertainty and longtime spans between demand generation and application. To effectively incorporate the expectations of technological innovation time (ET) into construction management, a multi-objective scheduling optimization model is proposed. This model treats duration, cost, and robustness as multi-objectives, using the Linear Scheduling Method (LSM), which is more suitable for linear projects. It incorporates ET as scattered buffers, predicted by the Graphic Evaluation and Review Technique (GERT) network planning method. An improved Nondominated Sorting Genetic Algorithm III (I-NSGA3) heuristic algorithm is employed to obtain the solution. Furthermore, the advantages of the model are examined through algorithm comparison, and sensitivity analysis is conducted to investigate the impact of ET on multiple objectives, as well as to determine the ET threshold for ensuring an optimal scheduling plan. Finally, case studies are presented to illustrate the applicability and effectiveness of the proposed model. The study concludes that when the expected time for technological innovation is less than one-eighth of the duration limit, an optimal schedule that balances cost, time, and robustness can be achieved. However, when the expected time exceeds half of the duration limit, significant schedule delays occur with minimal cost changes.

Authors

Institutions

Publication Details

Journal
Scientific Reports
Published
2026-05-16
DOI
https://doi.org/10.1038/s41598-026-49369-3
Primary Topic
Resource-Constrained Project Scheduling
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Multi-objective scheduling optimization for linear megaprojects considering technological innovation

Rui Lu, Xuan Zhao
Scientific Reports
Resource-Constrained Project Scheduling
article

Multi-objective scheduling optimization for linear megaprojects considering technological innovation

Rui Lu, Xuan Zhao
article en

Abstract

Technological innovation plays a critical role in driving the progress of linear megaprojects, despite being characterized by uncertainty and longtime spans between demand generation and application. To effectively incorporate the expectations of technological innovation time (ET) into construction management, a multi-objective scheduling optimization model is proposed. This model treats duration, cost, and robustness as multi-objectives, using the Linear Scheduling Method (LSM), which is more suitable for linear projects. It incorporates ET as scattered buffers, predicted by the Graphic Evaluation and Review Technique (GERT) network planning method. An improved Nondominated Sorting Genetic Algorithm III (I-NSGA3) heuristic algorithm is employed to obtain the solution. Furthermore, the advantages of the model are examined through algorithm comparison, and sensitivity analysis is conducted to investigate the impact of ET on multiple objectives, as well as to determine the ET threshold for ensuring an optimal scheduling plan. Finally, case studies are presented to illustrate the applicability and effectiveness of the proposed model. The study concludes that when the expected time for technological innovation is less than one-eighth of the duration limit, an optimal schedule that balances cost, time, and robustness can be achieved. However, when the expected time exceeds half of the duration limit, significant schedule delays occur with minimal cost changes.

Scientific Reports
Xihua University (CN), Sichuan Highway Design and Research Institute (CN)
Industry, innovation and infrastructure
Openalex Percentile: Top 2%
Resource-Constrained Project Scheduling
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.