Digital twin-based synchronous 4D BIM-driven UAS mission planning using the combined graph approach

Existing Unmanned Aerial Systems (UAS) mission planning approaches for construction monitoring, either rescan the entire building structure or address isolated coverage problems and rely on single-source inputs. This study introduces a mission-planning approach and establishes a framework that (i) prioritizes multi-type inspection fronts (specific indoor spaces/elements, facade regions, topmost in-progress levels), (ii) systematically fuses multi-source project information—into a digital twin-based synchronous 4D Building Information Model (BIM) by emerging an as-planned 4D BIM (with the latest schedule updates) and a digitally twinned as-built 4D BIM computed from a centralized point cloud repository—and (iii) employs a combined graph (topology-based model graph overlaid with a user-defined network grid) to improve reachability in complex interiors. This framework transcends traditional 4D BIM by establishing an asynchronous digital twin of the evolving construction project—that synchronizes the physical site and its digital counterpart after each mission scheduled on a user-defined time interval. Each completed mission updates the as-built 4D BIM, which regenerates the synchronous model for subsequent mission planning, thus maintaining a live, feedback-driven digital representation of the construction process. Validation was conducted in a virtual simulator using hypothetical building use cases of increasing architectural complexity, where the combined graph approach was compared against model-only graphs. Results demonstrated improved scan-point accessibility and reduced mission path length across all use cases. In addition, a comparative analysis of grid patterns showed that triangular, brace, and 3D Voronoi lattices provided the highest efficiency under concave and non-orthogonal conditions.

Authors

Institutions

Publication Details

Journal
Advanced Engineering Informatics
Published
2026-05-16
DOI
https://doi.org/10.1016/j.aei.2026.104814
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Digital twin-based synchronous 4D BIM-driven UAS mission planning using the combined graph approach

Parth Bhadaniya, Masoud Gheisari
Advanced Engineering Informatics
BIM and Construction Integration
article

Digital twin-based synchronous 4D BIM-driven UAS mission planning using the combined graph approach

Parth Bhadaniya, Masoud Gheisari
article en

Abstract

Existing Unmanned Aerial Systems (UAS) mission planning approaches for construction monitoring, either rescan the entire building structure or address isolated coverage problems and rely on single-source inputs. This study introduces a mission-planning approach and establishes a framework that (i) prioritizes multi-type inspection fronts (specific indoor spaces/elements, facade regions, topmost in-progress levels), (ii) systematically fuses multi-source project information—into a digital twin-based synchronous 4D Building Information Model (BIM) by emerging an as-planned 4D BIM (with the latest schedule updates) and a digitally twinned as-built 4D BIM computed from a centralized point cloud repository—and (iii) employs a combined graph (topology-based model graph overlaid with a user-defined network grid) to improve reachability in complex interiors. This framework transcends traditional 4D BIM by establishing an asynchronous digital twin of the evolving construction project—that synchronizes the physical site and its digital counterpart after each mission scheduled on a user-defined time interval. Each completed mission updates the as-built 4D BIM, which regenerates the synchronous model for subsequent mission planning, thus maintaining a live, feedback-driven digital representation of the construction process. Validation was conducted in a virtual simulator using hypothetical building use cases of increasing architectural complexity, where the combined graph approach was compared against model-only graphs. Results demonstrated improved scan-point accessibility and reduced mission path length across all use cases. In addition, a comparative analysis of grid patterns showed that triangular, brace, and 3D Voronoi lattices provided the highest efficiency under concave and non-orthogonal conditions.

Advanced Engineering InformaticsVol. 74
University of Florida (US)
National Science Foundation
Sustainable cities and communities
Openalex Percentile: Top 6%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.