Setup‐Optimized Sequencing in Job Shops: Modeling Workstation Productivity and Lateness Behavior

Sequence‐dependent setups in job‐shop manufacturing create a trade‐off: raising productivity through setup‐optimized sequencing tends to reduce schedule reliability. This study presents a modeling approach that quantifies this trade‐off at the workstation level. Building on the production operating curve and the boundary case with many setup families, the approach links sequencing effects to mean work‐in‐process (WIP) and utilization. The model yields expressions for the performance‐based and the effective productivity gains, which are bounded by the relative setup share and can only be realized during active production time. It also provides an expression for the sequence‐induced standard deviation of relative lateness as a function of WIP and utilization. Sensitivity results show proportional dependence on the setup share and diminishing gains with increasing numbers of setup families, while a two‐point comparison demonstrates the trade‐off. The model provides consistent metrics for positioning workstations within the productivity–schedule‐reliability trade‐off and for supporting sequencing and WIP‐related operating decisions.

Authors

Institutions

Publication Details

Journal
Advanced Engineering Materials
Published
2026-05-12
DOI
https://doi.org/10.1002/adem.202502727
Primary Topic
Assembly Line Balancing Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Setup‐Optimized Sequencing in Job Shops: Modeling Workstation Productivity and Lateness Behavior

Friederike Stefanowski, Peter Nyhuis, Matthias Schmidt
Advanced Engineering Materials
Assembly Line Balancing Optimization
article

Setup‐Optimized Sequencing in Job Shops: Modeling Workstation Productivity and Lateness Behavior

Friederike Stefanowski, Peter Nyhuis, Matthias Schmidt
article en

Abstract

Sequence‐dependent setups in job‐shop manufacturing create a trade‐off: raising productivity through setup‐optimized sequencing tends to reduce schedule reliability. This study presents a modeling approach that quantifies this trade‐off at the workstation level. Building on the production operating curve and the boundary case with many setup families, the approach links sequencing effects to mean work‐in‐process (WIP) and utilization. The model yields expressions for the performance‐based and the effective productivity gains, which are bounded by the relative setup share and can only be realized during active production time. It also provides an expression for the sequence‐induced standard deviation of relative lateness as a function of WIP and utilization. Sensitivity results show proportional dependence on the setup share and diminishing gains with increasing numbers of setup families, while a two‐point comparison demonstrates the trade‐off. The model provides consistent metrics for positioning workstations within the productivity–schedule‐reliability trade‐off and for supporting sequencing and WIP‐related operating decisions.

Advanced Engineering Materials
Leibniz University Hannover (DE)
Decent work and economic growth
Openalex Percentile: Top 4%
Assembly Line Balancing Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Setup‐Optimized Sequencing in Job Shops: Modeling Workstation Productivity and Lateness Behavior — Friederike Stefanowski, Peter Nyhuis, et al. · Advanced Engineering Materials (2026) | TGRS Research Map | TGRS