AN INTEGRATED AHP–TOPSIS–KNAPSACK–LLM HYBRID MODEL FOR PROJECT PORTFOLIO OPTIMIZATION

This paper proposes an integrated four-component hybrid pipeline for project portfolio optimization that combines the Analytic Hierarchy Process (AHP) for criterion weighting, TOPSIS for alternative ranking, 0/1 Knapsack dynamic programming for budget-constrained optimal selection, and GPT-4o based large-language-model (LLM) scoring for quantifying qualitative project documents. The mathematical apparatus, overall computational complexity O(n·m + n·B), and Design Science Research based experimental protocol are formalized. Validation is planned on a synthetic dataset of 20 projects across 30 replications against three baselines (pure NPV greedy, greedy heuristic, and pure MCDM). Four falsifiable hypotheses (H1–H4) are tested using paired t-tests, the Wilcoxon signed-rank test, and Monte Carlo sensitivity analysis. The novelty of the work lies in being the first fully integrated AHP+TOPSIS+0/1 Knapsack+LLM pipeline reported in the literature, with direct applicability to the IT initiatives planned under the "Digital Uzbekistan 2030" strategy.

Authors

Institutions

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-05-12
DOI
https://doi.org/10.5281/zenodo.20144717
Primary Topic
Advanced Multi-Objective Optimization Algorithms
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

AN INTEGRATED AHP–TOPSIS–KNAPSACK–LLM HYBRID MODEL FOR PROJECT PORTFOLIO OPTIMIZATION

Azizbek Rafiq ugli Shamsiyev
Zenodo (CERN European Organization for Nuclear Research)
Advanced Multi-Objective Optimization Algorithms
article

AN INTEGRATED AHP–TOPSIS–KNAPSACK–LLM HYBRID MODEL FOR PROJECT PORTFOLIO OPTIMIZATION

Azizbek Rafiq ugli Shamsiyev
article en

Abstract

This paper proposes an integrated four-component hybrid pipeline for project portfolio optimization that combines the Analytic Hierarchy Process (AHP) for criterion weighting, TOPSIS for alternative ranking, 0/1 Knapsack dynamic programming for budget-constrained optimal selection, and GPT-4o based large-language-model (LLM) scoring for quantifying qualitative project documents. The mathematical apparatus, overall computational complexity O(n·m + n·B), and Design Science Research based experimental protocol are formalized. Validation is planned on a synthetic dataset of 20 projects across 30 replications against three baselines (pure NPV greedy, greedy heuristic, and pure MCDM). Four falsifiable hypotheses (H1–H4) are tested using paired t-tests, the Wilcoxon signed-rank test, and Monte Carlo sensitivity analysis. The novelty of the work lies in being the first fully integrated AHP+TOPSIS+0/1 Knapsack+LLM pipeline reported in the literature, with direct applicability to the IT initiatives planned under the "Digital Uzbekistan 2030" strategy.

Zenodo (CERN European Organization for Nuclear Research)
Tashkent State University of Economics (UZ), University of World Economy and Diplomacy (UZ)
Industry, innovation and infrastructure
Openalex Percentile: Top 4%
Advanced Multi-Objective Optimization Algorithms
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

AN INTEGRATED AHP–TOPSIS–KNAPSACK–LLM HYBRID MODEL FOR PROJECT PORTFOLIO OPTIMIZATION — Azizbek Rafiq ugli Shamsiyev · Zenodo (CERN European Organization for Nuclear Research) (2026) | TGRS Research Map | TGRS