Corrigendum: Risk transmission and control in the prefabricated construction multi-project supply chain network: a SIS modeling approach

It has come to the attention of the publisher that the article Ren X, Zhang X, Tian J, Lin F (2026), “Risk transmission and control in the prefabricated construction multi-project supply chain network: a SIS modeling approach”. Engineering, Construction and Architectural Management, Vol. ahead-of-print No. ahead-of-print. https://doi.org/10.1108/ECAM-05-2025-0883, has been published with repeated references and its respective citation.The incorrect reference is:Liu, X.N., Meng, J.N., Wang, J.Y. and Ji, Y.B. (2024), “Influencing factors and improvement strategies of supply chain resilience of prefabricated construction from the perspective of dynamic capabilities: the case of China”, Engineering Construction and Architectural Management, Vol. 32 No. 5, pp. 3465-3494, doi: https://doi.org/10.1108/ecam-09-2023-0956The citation is incorrectly updated as “Liu et al., 2024” and it should be “Liu et al., 2025”.The publisher asks that references be entered correctly at submission and confirmed at article proofing stage.

Publication Details

Journal
Engineering Construction & Architectural Management
Published
2026-05-12
DOI
https://doi.org/10.1108/ecam-05-2026-0849
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Corrigendum: Risk transmission and control in the prefabricated construction multi-project supply chain network: a SIS modeling approach

Engineering Construction & Architectural Management
Construction Project Management and Performance
article

Corrigendum: Risk transmission and control in the prefabricated construction multi-project supply chain network: a SIS modeling approach

article en

Abstract

It has come to the attention of the publisher that the article Ren X, Zhang X, Tian J, Lin F (2026), “Risk transmission and control in the prefabricated construction multi-project supply chain network: a SIS modeling approach”. Engineering, Construction and Architectural Management, Vol. ahead-of-print No. ahead-of-print. https://doi.org/10.1108/ECAM-05-2025-0883, has been published with repeated references and its respective citation.The incorrect reference is:Liu, X.N., Meng, J.N., Wang, J.Y. and Ji, Y.B. (2024), “Influencing factors and improvement strategies of supply chain resilience of prefabricated construction from the perspective of dynamic capabilities: the case of China”, Engineering Construction and Architectural Management, Vol. 32 No. 5, pp. 3465-3494, doi: https://doi.org/10.1108/ecam-09-2023-0956The citation is incorrectly updated as “Liu et al., 2024” and it should be “Liu et al., 2025”.The publisher asks that references be entered correctly at submission and confirmed at article proofing stage.

Engineering Construction & Architectural Management
Openalex Percentile: Top 4%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Corrigendum: Risk transmission and control in the prefabricated construction multi-project supply chain network: a SIS modeling approach · Engineering Construction & Architectural Management (2026) | TGRS Research Map | TGRS