Evaluation of the Construction Process in Reinforced Concrete Buildings: The Case of Lima, Peru in the 21st Century

The maelstrom of construction in Lima, Peru, at the beginning of the 21st century brought with it many technological advances, but at the same time, many construction procedures that guaranteed structural quality were neglected. The research collects all the faults found during the manufacture of reinforced concrete elements in buildings, with the aim of analyzing their causes and consequences. At the same time, it proposes an alternative solution that complies with Peruvian regulations. The work involved visiting various construction sites in Lima and recording incorrect construction procedures. A search of photographic and oral sources was also carried out to supplement the database. The results revealed that the root of the problem lay in a lack of investment on the part of builders, since they did not have adequate equipment to manufacture the structural elements correctly. Another problem was the architectural design, which did not allow for sufficient clearance for installations and ended up compromising the masonry or reinforced concrete. It was concluded that the participation of all those involved in the project is necessary, and that it must be addressed from the planning, design, and execution phases in order to minimize errors and setbacks and obtain a quality product.

Authors

Publication Details

Journal
Civil Engineering and Architecture
Published
2026-05-01
DOI
https://doi.org/10.13189/cea.2026.140327
Primary Topic
Business, Innovation, and Economy
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Evaluation of the Construction Process in Reinforced Concrete Buildings: The Case of Lima, Peru in the 21st Century

Ninoska Paola Morales Balvin, Yair Yuri Cajahuanca Javier, Marko Antonio Lengua Fernandez
Civil Engineering and Architecture
Business, Innovation, and Economy
article

Evaluation of the Construction Process in Reinforced Concrete Buildings: The Case of Lima, Peru in the 21st Century

Ninoska Paola Morales Balvin, Yair Yuri Cajahuanca Javier, Marko Antonio Lengua Fernandez
article en

Abstract

The maelstrom of construction in Lima, Peru, at the beginning of the 21st century brought with it many technological advances, but at the same time, many construction procedures that guaranteed structural quality were neglected. The research collects all the faults found during the manufacture of reinforced concrete elements in buildings, with the aim of analyzing their causes and consequences. At the same time, it proposes an alternative solution that complies with Peruvian regulations. The work involved visiting various construction sites in Lima and recording incorrect construction procedures. A search of photographic and oral sources was also carried out to supplement the database. The results revealed that the root of the problem lay in a lack of investment on the part of builders, since they did not have adequate equipment to manufacture the structural elements correctly. Another problem was the architectural design, which did not allow for sufficient clearance for installations and ended up compromising the masonry or reinforced concrete. It was concluded that the participation of all those involved in the project is necessary, and that it must be addressed from the planning, design, and execution phases in order to minimize errors and setbacks and obtain a quality product.

Civil Engineering and ArchitectureVol. 14(3)
Sustainable cities and communities
Openalex Percentile: Top 3%
Business, Innovation, and Economy
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Evaluation of the Construction Process in Reinforced Concrete Buildings: The Case of Lima, Peru in the 21st Century — Ninoska Paola Morales Balvin, Yair Yuri Cajahuanca Javier, et al. · Civil Engineering and Architecture (2026) | TGRS Research Map | TGRS