An integrated multi-horizon approach for long-term reconfiguration and mid-term sequencing in global production networks

Rapid adaptation to volatile demand is a critical challenge for production systems in global production networks. While reconfigurable manufacturing systems enable structural adjustments of capabilities and capacities, reconfiguration activities temporarily reduce production feasibility because capabilities can be unavailable during dismantling, transportation, and installation. This paper presents an integrated multi-horizon planning approach that jointly considers long-term reconfiguration decisions and mid-term order allocation, sequencing, and replanning. Mixed-integer linear optimization models explicitly capture reconfiguration with respective dismantling, transportation, and installation processes. Computational results show that reallocating existing capabilities reduces long-term costs, while sequencing and mid-term replanning are essential to avoid backorders and improve responsiveness.

Authors

Institutions

Publication Details

Journal
CIRP Annals
Published
2026-05-01
DOI
https://doi.org/10.1016/j.cirp.2026.04.025
Primary Topic
Flexible and Reconfigurable Manufacturing Systems
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

An integrated multi-horizon approach for long-term reconfiguration and mid-term sequencing in global production networks

Michael Martin, Vanessa Altmann
CIRP Annals
Flexible and Reconfigurable Manufacturing Systems
article

An integrated multi-horizon approach for long-term reconfiguration and mid-term sequencing in global production networks

Michael Martin, Vanessa Altmann
article en

Abstract

Rapid adaptation to volatile demand is a critical challenge for production systems in global production networks. While reconfigurable manufacturing systems enable structural adjustments of capabilities and capacities, reconfiguration activities temporarily reduce production feasibility because capabilities can be unavailable during dismantling, transportation, and installation. This paper presents an integrated multi-horizon planning approach that jointly considers long-term reconfiguration decisions and mid-term order allocation, sequencing, and replanning. Mixed-integer linear optimization models explicitly capture reconfiguration with respective dismantling, transportation, and installation processes. Computational results show that reallocating existing capabilities reduces long-term costs, while sequencing and mid-term replanning are essential to avoid backorders and improve responsiveness.

CIRP Annals
Karlsruhe Institute of Technology (DE)
Industry, innovation and infrastructure
Openalex Percentile: Top 7%
Flexible and Reconfigurable Manufacturing Systems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

An integrated multi-horizon approach for long-term reconfiguration and mid-term sequencing in global production networks — Michael Martin, Vanessa Altmann · CIRP Annals (2026) | TGRS Research Map | TGRS