A Machine Learning Framework for Early-Stage Cost Estimation of Transportation Projects

To address the limitations of traditional planning-level cost estimating methods, such as reliance on statewide averages, heavy reliance on engineering judgment, and high levels of inaccuracy, this study developed two data-driven frameworks and corresponding tools. The first framework focused on resurfacing projects and used treatment-specific simple linear regression based on lane miles and geographic location. The second addressed a broader group of construction projects and used multiple linear regression with project length, route type, and right-of-way cost as key predictors. In both frameworks, the final estimates are computed by aggregating multiple estimates produced by county-, region-, and state-level models. The resurfacing framework produced more stable results, with an overall MAPE of 32.45% and MPE of -1%. The construction framework showed weaker performance, with an overall MAPE of 143.91% and MPE of 106.04%. Both frameworks produced estimates that generally align with industry standards for the expected accuracy of early-stage cost estimates.

Authors

Institutions

Publication Details

Journal
Digital Commons - East Tennessee State University (East Tennessee State University)
Published
2026-05-01
Primary Topic
Infrastructure Maintenance and Monitoring
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A Machine Learning Framework for Early-Stage Cost Estimation of Transportation Projects

Pritom Paul
Digital Commons - East Tennessee State University (East Tennessee State University)
Infrastructure Maintenance and Monitoring
article

A Machine Learning Framework for Early-Stage Cost Estimation of Transportation Projects

Pritom Paul
article en

Abstract

To address the limitations of traditional planning-level cost estimating methods, such as reliance on statewide averages, heavy reliance on engineering judgment, and high levels of inaccuracy, this study developed two data-driven frameworks and corresponding tools. The first framework focused on resurfacing projects and used treatment-specific simple linear regression based on lane miles and geographic location. The second addressed a broader group of construction projects and used multiple linear regression with project length, route type, and right-of-way cost as key predictors. In both frameworks, the final estimates are computed by aggregating multiple estimates produced by county-, region-, and state-level models. The resurfacing framework produced more stable results, with an overall MAPE of 32.45% and MPE of -1%. The construction framework showed weaker performance, with an overall MAPE of 143.91% and MPE of 106.04%. Both frameworks produced estimates that generally align with industry standards for the expected accuracy of early-stage cost estimates.

Digital Commons - East Tennessee State University (East Tennessee State University)
East Tennessee State University (US)
Sustainable cities and communities, Industry, innovation and infrastructure
Openalex Percentile: Top 9%
Infrastructure Maintenance and Monitoring
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.