Optimal network topology and alignment design for minimizing construction costs of wind farm access roads
Designing road networks for wind farms in complex terrain is a challenging task, especially under tight construction budgets. Traditional manual methods are time-consuming and may yield suboptimal results. A new structured three-phase optimization framework named TriPhase is proposed to automate and minimize road construction costs from corridor selection to earthwork. Phase one formulates corridor selection as a Steiner minimum tree problem over a terrain-aware graph, incorporating slope and curvature constraints. In phase two, each road segment undergoes horizontal alignment optimization using a bilevel model, where a mixed-integer linear program evaluates vertical alignment costs. To ensure solver compatibility and performance, the model is reformulated explicitly for Gurobi. The final phase applies a network-wide convex optimization model to refine vertical alignment and earthwork costs. Numerical experiments on real-world sites demonstrate up to 14% cost savings compared to previously developed manual designs, validating the framework’s effectiveness and practical relevance.
Authors
- Yves Lucet (ORCID: https://orcid.org/0000-0003-0349-6737)
- John R.J. Thompson (ORCID: https://orcid.org/0000-0002-6303-449X)
- Warren Hare (ORCID: https://orcid.org/0000-0002-4240-3903)
- Paavai Manimaran Vanjeenathammal
Institutions
- Okanagan University College (CA)
Publication Details
- Journal
- Computer-Aided Civil and Infrastructure Engineering
- Published
- 2026-05-01
- DOI
- https://doi.org/10.1016/j.cacaie.2026.100058
- Primary Topic
- Infrastructure Maintenance and Monitoring
- Type
- article
- Field-Weighted Citation Impact
- 0.00
Funders
- Innovate BC