Application of Theory of Constraint Principle for Production Scheduling in PT. Nusira Medan

PT. Nusira Medan as a producer of Crumb Rubber, based on orders with First Come First Serve (FCFS) rules. Limited resources lead to delay in order completion time. This causes delays in delivery of orders to consumers. Therefore, this research is to obtain optimal scheduling sequence with the criteria of minimizing waiting time, idle time and makespan The use of the Theory of Constraints principle is to arrange production scheduling as a solution to the problem. Expected results are the most appropriate scheduling to be applied to the company in accordance with the criteria of waiting time, idle time and makespan. The result of the research is the sequence of job scheduling sequence1-2-3-4-5 resulted in makespan of 26.47 days or 211,76 hours, idle time of 37.25 hours and waiting time of 32.85 hours . While the scheduling systems under the First Come First Serve (FCFS) rules of job scheduling sequence to 1-2-3-4-5 with makepan value of 27.46 days, idle time of 48.84 hours and waiting time of 54.24 hours. The reduction of makespan of 0.98 days or 7.84 hours, idle time reduction of 11.59 hours and waiting time of 21.39 hours

Authors

Publication Details

Journal
Science Publishing Corporation Inc. - International Journal of Engineering & Technology
Published
2026-05-02
DOI
https://doi.org/10.14419/ijet.v7i2.14.14889
Primary Topic
Operations Management Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Application of Theory of Constraint Principle for Production Scheduling in PT. Nusira Medan

Mhd. Asaad, Oris Krianto Sulaiman, Mahrani Arfah, Luthfi Parinduri et al.
Science Publishing Corporation Inc. - International Journal of Engineering & Technology
Operations Management Techniques
article

Application of Theory of Constraint Principle for Production Scheduling in PT. Nusira Medan

Mhd. Asaad, Oris Krianto Sulaiman, Mahrani Arfah, Luthfi Parinduri, D Darmawati, Abdurrozzaq Hasibuan
article en

Abstract

PT. Nusira Medan as a producer of Crumb Rubber, based on orders with First Come First Serve (FCFS) rules. Limited resources lead to delay in order completion time. This causes delays in delivery of orders to consumers. Therefore, this research is to obtain optimal scheduling sequence with the criteria of minimizing waiting time, idle time and makespan The use of the Theory of Constraints principle is to arrange production scheduling as a solution to the problem. Expected results are the most appropriate scheduling to be applied to the company in accordance with the criteria of waiting time, idle time and makespan. The result of the research is the sequence of job scheduling sequence1-2-3-4-5 resulted in makespan of 26.47 days or 211,76 hours, idle time of 37.25 hours and waiting time of 32.85 hours . While the scheduling systems under the First Come First Serve (FCFS) rules of job scheduling sequence to 1-2-3-4-5 with makepan value of 27.46 days, idle time of 48.84 hours and waiting time of 54.24 hours. The reduction of makespan of 0.98 days or 7.84 hours, idle time reduction of 11.59 hours and waiting time of 21.39 hours

Science Publishing Corporation Inc. - International Journal of Engineering & Technology
Openalex Percentile: Top 5%
Operations Management Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.