Stage and Run-Up Amplification in Three-Cascade Landslide-Dam Systems: Evidence from a Large-Scale Flume Experiment

Cascading failures of clustered landslide dams can intensify downstream hazards not only by increasing peak flood magnitude but also by accelerating the rise of water level immediately upstream of successive dams, thereby shortening the available response time before overtopping. This study reports large-scale flume experiments on a three-dam cascade built with identical geometry and similar soil gradation, while systematically varying longitudinal spacing and inflow discharge. The principal measured variable, Cw(t), is defined here as the local forebay run-up/water-level record measured at a fixed gauge position immediately upstream of each dam. The run-up hydrographs were summarized using peak run-up Cwmax, threshold-arrival time ta defined at 0.1 Cwmax, time to peak tp, maximum rising-stage rate Smax, and above-threshold duration T. Across ten tests (five spacing configurations under low/high discharge), peak run-up at both downstream dams consistently exceeded that at Dam1, with amplification factors relative to Dam1 of 1.11–1.45 at Dam2 and 1.13–1.42 at Dam3; Dam3 was not always higher than Dam2. Amplification was much stronger in the rising-stage dynamics: Smax increased relative to Dam1 by factors of 1.56–11.0 at Dam2 and 2.27–14.0 at Dam3, demonstrating pronounced downstream wavefront steepening. Higher discharge produced earlier threshold arrivals and peaks throughout the cascade, whereas shorter spacing generally produced more impulsive downstream responses with sharper peaks and larger rate amplification. Overall, the dataset provides stage/run-up-based constraints on cascade amplification and indicates that, within the present experimental matrix, dam spacing is the dominant geometric control on flood propagation and downstream hazard escalation.

Authors

Institutions

Publication Details

Journal
Water
Published
2026-04-30
DOI
https://doi.org/10.3390/w18091080
Primary Topic
Landslides and related hazards
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Stage and Run-Up Amplification in Three-Cascade Landslide-Dam Systems: Evidence from a Large-Scale Flume Experiment

Zhiyuan Gu, Hongyi Zhang, Yanwei Zhai, Chuke Meng et al.
Water
Landslides and related hazards
article

Stage and Run-Up Amplification in Three-Cascade Landslide-Dam Systems: Evidence from a Large-Scale Flume Experiment

Zhiyuan Gu, Hongyi Zhang, Yanwei Zhai, Chuke Meng, Dawen Tan, Chunyao Hou, Weiyang Zhao
article en

Abstract

Cascading failures of clustered landslide dams can intensify downstream hazards not only by increasing peak flood magnitude but also by accelerating the rise of water level immediately upstream of successive dams, thereby shortening the available response time before overtopping. This study reports large-scale flume experiments on a three-dam cascade built with identical geometry and similar soil gradation, while systematically varying longitudinal spacing and inflow discharge. The principal measured variable, Cw(t), is defined here as the local forebay run-up/water-level record measured at a fixed gauge position immediately upstream of each dam. The run-up hydrographs were summarized using peak run-up Cwmax, threshold-arrival time ta defined at 0.1 Cwmax, time to peak tp, maximum rising-stage rate Smax, and above-threshold duration T. Across ten tests (five spacing configurations under low/high discharge), peak run-up at both downstream dams consistently exceeded that at Dam1, with amplification factors relative to Dam1 of 1.11–1.45 at Dam2 and 1.13–1.42 at Dam3; Dam3 was not always higher than Dam2. Amplification was much stronger in the rising-stage dynamics: Smax increased relative to Dam1 by factors of 1.56–11.0 at Dam2 and 2.27–14.0 at Dam3, demonstrating pronounced downstream wavefront steepening. Higher discharge produced earlier threshold arrivals and peaks throughout the cascade, whereas shorter spacing generally produced more impulsive downstream responses with sharper peaks and larger rate amplification. Overall, the dataset provides stage/run-up-based constraints on cascade amplification and indicates that, within the present experimental matrix, dam spacing is the dominant geometric control on flood propagation and downstream hazard escalation.

WaterVol. 18(9)
China Three Gorges Corporation (China) (CN), Sichuan University (CN), Yalong Hydro (China) (CN), State Key Laboratory of Hydraulics and Mountain River Engineering
National Natural Science Foundation of China, China Yangtze Power
Openalex Percentile: Top 5%
Landslides and related hazards
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.