Study on the Influence of Isolation Pile Density on the Deformation of High-Speed Railway Bridge Piles Induced by Lateral Shield Tunneling
The impact of short-distance lateral shield tunneling threatens the safety of operational high-speed railways (HSRs). To address the engineering challenge of “how to select isolation pile density under fixed cost constraints,” this study focuses on the Xi’an Metro shield tunnel section passing laterally adjacent to the Daxi and Zhengxi Passenger Dedicated Lines. Under the constraint of identical total economic costs, two isolation pile schemes—low-density and high-density—were established to investigate the control patterns of different densities on HSR bridge piles and surrounding ground surface deformation. A three-dimensional (3D) numerical model was developed for the lateral shield tunneling process. Combined with field-measured data, numerical simulations were conducted for corresponding construction stages to analyze the disturbance effects of shield tunneling on HSR piers and the surrounding ground, as well as the deformation restraint performance of isolation piles. The results indicate that the high-density isolation pile scheme (pile spacing: 2.0 m; pile length: 22 m) provides superior control compared to the low-density scheme (pile spacing: 4 m; pile length: 28 m). Following single- and double-track excavation, the vertical displacement of HSR piers was reduced by 0.6 mm and 1.1 mm, respectively—a reduction of 40–74%. Furthermore, the pier displacement along the depth direction shifted from non-uniform to relatively uniform. The difference in surface settlement between the two schemes was only 0.2 mm, suggesting that isolation pile density has a marginal impact on ground deformation. The horizontal displacement of high-density isolation piles stabilized at 1.7–1.9 mm, with vertical heave ranging from 1.2 to 1.4 mm. The lateral displacement profile exhibited a regular “double-C outward expansion” shape, which is better suited to the characteristics of water-rich sand layers. Initial excavation causes significant disturbance to the original strata, necessitating enhanced stress field protection measures. The high-density scheme is recommended for engineering applications, as it achieves optimal control of bridge pile deformation under cost constraints and meets regulatory specifications.
Authors
- Liang Shou
- Yuan Wen
- Xuan Zhang
- Tao Yang (ORCID: https://orcid.org/0000-0002-3595-319X)
- Lei Lei
- Yongzhi Cheng
Institutions
- Xi'an Polytechnic University (CN)
- China Communications Construction Company (China) (CN)
Publication Details
- Journal
- Buildings
- Published
- 2026-05-01
- DOI
- https://doi.org/10.3390/buildings16091810
- Primary Topic
- Geotechnical Engineering and Analysis
- Type
- article
- Field-Weighted Citation Impact
- 0.00