Evaluation and Development of Road Networks

After the war, the national road network was no longer suited to heavy goods vehicle traffic conditions. As a result, the Roads Directorate defined a 33.000 km national network in 1973, on which the State would make the necessary improvements. During the same period, the Central Laboratory of Bridges and Roads (LCPC) worked on the creation of more resistant, more durable, and economical bitumen road structures. This last point proved all the more crucial during the 1974 oil crisis. The creation of 17 Regional Laboratories (LRPC) made it possible to experiment, control, and disseminate new techniques. Thus, in about fifteen years, 22,000 km of national roads were rehabilitated. At the same time, the State was preparing to build more than 10,000 km of 0highways. In the I980s, the technologies developed by the Laboratory network were widely disseminated throughout the world. For around twenty years, on all continents, many states, often assisted by the World Bank, have relied on studies by SERI (International Studies and Research Service of the LCPC) to prepare and sometimes carry out the restoration of their networks.

Authors

Institutions

Publication Details

Journal
Springer Link (Chiba Institute of Technology)
Published
2026-04-29
DOI
https://doi.org/10.1051/epjconf/202636601013/pdf
Primary Topic
Infrastructure Maintenance and Monitoring
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Evaluation and Development of Road Networks

Jean-Louis Brousse
Springer Link (Chiba Institute of Technology)
Infrastructure Maintenance and Monitoring
article

Evaluation and Development of Road Networks

Jean-Louis Brousse
article en

Abstract

After the war, the national road network was no longer suited to heavy goods vehicle traffic conditions. As a result, the Roads Directorate defined a 33.000 km national network in 1973, on which the State would make the necessary improvements. During the same period, the Central Laboratory of Bridges and Roads (LCPC) worked on the creation of more resistant, more durable, and economical bitumen road structures. This last point proved all the more crucial during the 1974 oil crisis. The creation of 17 Regional Laboratories (LRPC) made it possible to experiment, control, and disseminate new techniques. Thus, in about fifteen years, 22,000 km of national roads were rehabilitated. At the same time, the State was preparing to build more than 10,000 km of 0highways. In the I980s, the technologies developed by the Laboratory network were widely disseminated throughout the world. For around twenty years, on all continents, many states, often assisted by the World Bank, have relied on studies by SERI (International Studies and Research Service of the LCPC) to prepare and sometimes carry out the restoration of their networks.

Springer Link (Chiba Institute of Technology)
Building Bridges (US)
Openalex Percentile: Top 11%
Infrastructure Maintenance and Monitoring
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.