Optimal Reactive Power Compensation in Offshore HVAC Transmission: Evaluating Onshore and Subsea Reactor Placement

The electrification of floating production, storage, and offloading (FPSO) units has emerged as a strategic solution to meet the growing demand for increased oil production while reducing carbon emissions associated with onboard gas turbine generation. Power-from-shore (PFS) systems represent a promising approach to achieving this goal, with transmission technologies based on high-voltage direct current (HVDC) and high-voltage alternating current (HVAC) solutions. Although HVDC is more suitable for long-distance and high-power applications, HVAC systems offer advantages in terms of robustness, simplicity, and operational maturity. Nevertheless, the reactive power compensation requirements arising from the high capacitance of submarine cables remain a major technical challenge. This study investigates and compares several reactive power compensation topologies applied to three distinct PFS systems. The proposed methodology enables a comprehensive evaluation of both onshore and subsea reactor placement strategies under technically and technologically feasible conditions. The results demonstrate that long-distance transmission of 75 MW over 250 km was achieved exclusively through subsea compensation configurations, which maintained efficiencies above 90% and voltage and current profiles within operational limits. Conversely, onshore-only compensation proved to be the most efficient solution for shorter transmission distances. The results demonstrate that the full electrification of an FPSO is technically feasible, with voltage and current profiles remaining within acceptable operational limits. The findings also indicate that mid-cable reactor placement (at 50%) is not the most effective configuration, with superior results observed for placements at 20–80% and 40–70% of the cable length. Overall, the outcomes confirm that subsea reactor placement enables higher power transfer over longer distances, significantly extending the technical boundaries traditionally separating HVDC and HVAC solutions. These results emphasize the need for continued technological development to make subsea shunt reactor installation a viable and reliable option for future FPSO electrification projects.

Authors

Institutions

Publication Details

Journal
Energies
Published
2026-04-25
DOI
https://doi.org/10.3390/en19092085
Primary Topic
Offshore Engineering and Technologies
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimal Reactive Power Compensation in Offshore HVAC Transmission: Evaluating Onshore and Subsea Reactor Placement

Frederico Oliveira Passos, Lúcio José da Motta, Ivan P. Faria, José Mauro T. Marinho et al.
Energies
Offshore Engineering and Technologies
article

Optimal Reactive Power Compensation in Offshore HVAC Transmission: Evaluating Onshore and Subsea Reactor Placement

Frederico Oliveira Passos, Lúcio José da Motta, Ivan P. Faria, José Mauro T. Marinho, Carlos A. C. Cavaliere, Rodrigo de Moraes P. da Rosa, Gabriel Victor dos S. C. Campos, Lucas Henrique Venâncio, Vinicius Z. Silva
article en

Abstract

The electrification of floating production, storage, and offloading (FPSO) units has emerged as a strategic solution to meet the growing demand for increased oil production while reducing carbon emissions associated with onboard gas turbine generation. Power-from-shore (PFS) systems represent a promising approach to achieving this goal, with transmission technologies based on high-voltage direct current (HVDC) and high-voltage alternating current (HVAC) solutions. Although HVDC is more suitable for long-distance and high-power applications, HVAC systems offer advantages in terms of robustness, simplicity, and operational maturity. Nevertheless, the reactive power compensation requirements arising from the high capacitance of submarine cables remain a major technical challenge. This study investigates and compares several reactive power compensation topologies applied to three distinct PFS systems. The proposed methodology enables a comprehensive evaluation of both onshore and subsea reactor placement strategies under technically and technologically feasible conditions. The results demonstrate that long-distance transmission of 75 MW over 250 km was achieved exclusively through subsea compensation configurations, which maintained efficiencies above 90% and voltage and current profiles within operational limits. Conversely, onshore-only compensation proved to be the most efficient solution for shorter transmission distances. The results demonstrate that the full electrification of an FPSO is technically feasible, with voltage and current profiles remaining within acceptable operational limits. The findings also indicate that mid-cable reactor placement (at 50%) is not the most effective configuration, with superior results observed for placements at 20–80% and 40–70% of the cable length. Overall, the outcomes confirm that subsea reactor placement enables higher power transfer over longer distances, significantly extending the technical boundaries traditionally separating HVDC and HVAC solutions. These results emphasize the need for continued technological development to make subsea shunt reactor installation a viable and reliable option for future FPSO electrification projects.

EnergiesVol. 19(9)
Petrobras (Brazil) (BR), Universidade Federal de Itajubá (BR)
Petrobras
Openalex Percentile: Top 6%
Offshore Engineering and Technologies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.