Evaluation of the Locational Value of Diverse Non-Wires Alternative Portfolios for Network Investment Deferral: From Individual DERs to Integrated Controllable Microgrids

Increasing load demand and localized constraints are driving the need for cost-effective alternatives to traditional network reinforcement. However, existing Non-Wires Alternative (NWA) planning approaches often rely on simplified assumptions or computationally intensive full-year optimization, limiting their practical applicability. This study proposes a planning-oriented method integrating 8760-h Direct Load Flow (DLF)-based assessment, worst-case screening, and Mixed-Integer Linear Programming (MILP)-based resource sizing for the coordinated deployment of Energy Storage Systems (ESSs), Demand Response (DR), and Photovoltaic (PV) resources, along with building-scale microgrid candidates. The proposed microgrid candidates are modeled as grid-connected, building-scale configurations in which PV, ESSs, and DR are co-located at a single node, representing integrated resource units within the distribution system. The results show that voltage constraints are the dominant limiting factor and that NWAs primarily function as an investment deferral strategy rather than a full replacement for traditional reinforcement, delaying constraint violations by approximately 2 to 14 years. An ESS provides the most direct contribution to constraint mitigation, while DR and PV offer complementary support. The results also highlight the importance of locational deployment. In particular, a co-located microgrid configuration (MG_111) is selected as the optimal portfolio under moderate load growth conditions (Case B, 2%), demonstrating the practical feasibility of integrated DER deployment at a single node. Economic feasibility is found to be highly sensitive to incentive design, with profitability achieved only under favorable compensation conditions. These results demonstrate that coordinated DER portfolios can effectively extend deferral periods and provide practical insights into cost-effective NWA planning under realistic operating conditions.

Authors

Institutions

Publication Details

Journal
Electronics
Published
2026-04-27
DOI
https://doi.org/10.3390/electronics15091843
Primary Topic
Optimal Power Flow Distribution
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Evaluation of the Locational Value of Diverse Non-Wires Alternative Portfolios for Network Investment Deferral: From Individual DERs to Integrated Controllable Microgrids

San Kim, Juwon Park, Sung-Kwan Joo
Electronics
Optimal Power Flow Distribution
article

Evaluation of the Locational Value of Diverse Non-Wires Alternative Portfolios for Network Investment Deferral: From Individual DERs to Integrated Controllable Microgrids

San Kim, Juwon Park, Sung-Kwan Joo
article en

Abstract

Increasing load demand and localized constraints are driving the need for cost-effective alternatives to traditional network reinforcement. However, existing Non-Wires Alternative (NWA) planning approaches often rely on simplified assumptions or computationally intensive full-year optimization, limiting their practical applicability. This study proposes a planning-oriented method integrating 8760-h Direct Load Flow (DLF)-based assessment, worst-case screening, and Mixed-Integer Linear Programming (MILP)-based resource sizing for the coordinated deployment of Energy Storage Systems (ESSs), Demand Response (DR), and Photovoltaic (PV) resources, along with building-scale microgrid candidates. The proposed microgrid candidates are modeled as grid-connected, building-scale configurations in which PV, ESSs, and DR are co-located at a single node, representing integrated resource units within the distribution system. The results show that voltage constraints are the dominant limiting factor and that NWAs primarily function as an investment deferral strategy rather than a full replacement for traditional reinforcement, delaying constraint violations by approximately 2 to 14 years. An ESS provides the most direct contribution to constraint mitigation, while DR and PV offer complementary support. The results also highlight the importance of locational deployment. In particular, a co-located microgrid configuration (MG_111) is selected as the optimal portfolio under moderate load growth conditions (Case B, 2%), demonstrating the practical feasibility of integrated DER deployment at a single node. Economic feasibility is found to be highly sensitive to incentive design, with profitability achieved only under favorable compensation conditions. These results demonstrate that coordinated DER portfolios can effectively extend deferral periods and provide practical insights into cost-effective NWA planning under realistic operating conditions.

ElectronicsVol. 15(9)
Korea University (KR)
Ministry of Trade, Industry and Energy, Korea Institute of Energy Technology Evaluation and Planning
Openalex Percentile: Top 8%
Optimal Power Flow Distribution
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.